Herdianingrum, Lita (2019) Penerapan Manajemen Risiko Rantai Pasok Proyek 438 PT INKA (Persero) dengan Metode House of Risk (HOR). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
02411540000003-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
PT Industri Kereta Api (Persero) memiliki sistem rantai pasok yang bersifat kompleks mulai dari pengadaan bahan baku sampai pengiriman produk ke konsumen.Sifat beberapa komponen penyusun kereta api yang unik juga menambah tingkat kompleksitas rantai pasok perusahaan ini. Selain itu, kondisi eksternal seperti kondisi ekonomi global juga mempengaruhi kondisi rantai pasok. Permasalahan seperti keterlambatan datangnya bahan baku, perubahan harga bahan baku, dan komponen yang dihasilkan tidak sesuai spesifikasi merupakan beberapa permasalahan yang dihadapai PT INKA (Persero). Pengelolaan risiko dilakukan pada jaringan rantai pasok untuk mengurangi ketidakpastian rantai pasok secara menyeluruh. Metode yang digunakan pada penelitian ini adalah House of Risk (HOR). Pada penelitian ini dilakukan penetapan konteks, pemetaan risiko, identifikasi risiko, penilaian risiko, evaluasi risiko, dan perumusan tindakan respon risiko. Penelitian ini berfokus pada risiko rantai pasok berdasarkan metode SCOR yaitu source, make, dan deliver. Penelitian ini dilakukan dengan wawancara, diskusi, serta penyebaran kuisioner kepada pihak PT INKA (Persero). Pemetaan risiko dilakukan dengan menggunakan Supply Chain Risk Identification System (SCRIS). Dari proses identifikasi dan analisis risiko diperoleh 22 kejadian risiko yaitu 11 kejadian risiko pada tahap source, 9 kejadian risiko pada tahap make, dan 2 kejadian risiko pada tahap deliver dengan 59 penyebab risiko yang menyebabkan kejadian risiko tersebut. Perhitungan dengan menggunakan HOR 1 menghasilkan nilai ARP untuk menentukan prioritas risiko. Penentuan prioritas risiko dilakukan dengan menggunakan diagram pareto dan diskusi dengan pihak PT INKA (Persero). Dari hasil perumusan tindakan respon risiko, terdapat 15 tindakan respon risiko yang dirumuskan untuk mengatasi risiko rantai pasok PT INKA (Persero).
=============================================================================================================================
Supply chain conditions at PT INKA (Persero) are complex, ranging from procurement activities to delivering products to consumers. External conditions such as supply and demand fluctuations, global economic conditions, and technological competition among railway manufacturing industries also affect the condition of the supply chain. The current problems faced by PT INKA (Persero) include delays in incoming materials, changing material prices, and components that do not meet specifications. Risk management is conducted within the supply chain network to manage the overall uncertainty of supply chain risk. This research uses the House of Risk (HOR) method and is conducted through the following stages: context establishment, risk identification, risk assessment, risk evaluation, and the formulation of risk treatment. This research focuses on supply chain risk based on the SCOR model, which consists of source, make, and deliver. The research was conducted through interviews, discussions, and questionnaires. Risk mapping was conducted using Supply Chain Risk Identification (SCRIS), which identified 22 risk events consisting of 2 risk events in source, 9 risk events in make, and 2 risk events in deliver, along with 59 risk agents in total. The results of the ARP calculation using HOR 1 were used to determine risk priorities, which were established using a Pareto diagram and brainstorming with experts. The results show 15 risk treatments that can be used to manage supply chain risk at PT INKA (Persero).
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | House of Risk (HOR), SCOR Model, Supply Chain Risk Identification and Mapping, Supply Chain Risk Management. |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management |
| Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
| Depositing User: | Lita Herdianingrum |
| Date Deposited: | 21 Jul 2026 07:37 |
| Last Modified: | 21 Jul 2026 07:37 |
| URI: | http://repository.its.ac.id/id/eprint/65398 |
Actions (login required)
![]() |
View Item |