Asprila Akbar, Adi (2019) Perencanaan Sistem Manajemen K3 (SMK3) Pada Pekerjaan Erection Girdr Proyek Relokasi Jalan Tol Ruas Porong - Kejapanan Dengan Identifikasi Bahaya, Penilaian Resiko Dan Pengendalian Resiko Metode (HIRARC). Diploma thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111815000062-Non_Degree.pdf - Accepted Version Download (12MB) | Preview |
Abstract
Dalam rangka menunjang kualitas bangunan dan juga kualitas
pekerja maka dalam penerapan sistem Manajeman Kesehatan dan
Keselamatan Kerja Konstruksi (SMK3) berbentuk Rencana Kesehatan
dan Keselamatan Kerja Kontrak (RK3K) yang nantinya akan di gunakan
sebagai acuan K3 dalam pelaksanaan proyek pekerjaan
Sistem Manajemen Keselamatan dan Kesehatan Kerja
Konstruksi (SMK3) Konstruksi adalah bagian dari sistem manajemen
organisasi pelaksanaan pekerjaan konstruksi. SMK3 Konstruksi meliputi:
Kebijakan K3, Organisasi K3, Perencanaan K3, dan Biaya Umum SMK3.
Perencanaan K3 meliputi identifikasi bahaya, penilaian risiko,
pengendalian risiko, pemenuhan perundang-undangan, sasaran dan
program K3, kemudian pengendalian operasional. Tugas Akhir Terapan
ini penulis merencanakan SMK3 pada pekerjaan erection girder (girder
erection) Proyek Relokasi Jalan Tol Ruas Porong - Kejapanan
menggunakan Crawler Crane. Pada identifikasi bahaya, penilaian risiko
dan pengendalian risiko yang merupakan penjabaran dari Perencanaan K3
penulis menggunakan metode HIRARC (Hazard Identification, Risk
Assessment and Risk Control). HIRARC merupakan proses mengidentifikasi bahaya yang dapat terjadi dalam aktivitas rutin maupun
aktivitas tidak rutin pada suatu perusahaan, kemudian dilakukan penilaian
risiko dari bahaya tersebut. Setelah semua perencanaan K3 usai, dihitung
biaya penyelenggaraan SMK3. Diharapkan Tugas Akhir Terapan ini
dapat membantu perusahaan jasa konstruksi di Indonesia lebih
meningkatkan kesadaran kesehatan dan keselamatan kerja pada pekerjaan
erection girder dengan metode identifikasi bahaya dan penyebab bahaya
yang lebih teliti.
========================================================================================================
In order to support the quality of the building and also the quality of the workers then in the implementation of the system of Management and Occupational Health Construction (SMK3) in the form of Health and Safety Plan Contract (RK3K) which will be used as a reference K3 in the implementation of project work.
Occupational Health and Safety Management System in construction work is part of the organization's management system for the implementation of construction works in the context of risk control in each construction work. OHS Management System in Construction includes: OHS policy; OHS organization; OHS planning; Operational Control. In this Applied Final Project, the authors plan OHS management system on the Erection Girder work of the porong - kejapanan toll road using crawler craner. In the OHS Planning, the author using HIRARC (Hazard Identification, Risk Assessment and Risk Control) method. HIRARC is a process of identifying hazards that can occur in routine activities or non-routine activities in a construction, then carried out risk assessment of the hazard. So we can know the cause of the danger thoroughly. After that, the cost of OSH is calculated. It is expected that this Applied Final Project can help construction service companies in Indonesia will raise awareness of OHS at erection girder work with hazard identification and causes thoroughly.
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSIS 625.7 Akb p-1 3100019082150 |
Uncontrolled Keywords: | Occupational Health and Safety Management System, Erection girder, HIRARC, Cost of OSH, Perencanaan SMK3, Girder Erection, HIRARC, Biaya Umum SMK3 |
Subjects: | T Technology > T Technology (General) > T55 Industrial Safety T Technology > TE Highway engineering. Roads and pavements |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Adi asprila akbar |
Date Deposited: | 21 Oct 2020 23:30 |
Last Modified: | 21 Oct 2020 23:30 |
URI: | http://repository.its.ac.id/id/eprint/65723 |
Actions (login required)
View Item |