Perencanaan Pengumpulan dan Tempat Penampungan Sementara (TPS) Sampah Rumah Tangga Kecamatan Taman, Kabupaten Sidoarjo

Putra, Niko Lovandra (2019) Perencanaan Pengumpulan dan Tempat Penampungan Sementara (TPS) Sampah Rumah Tangga Kecamatan Taman, Kabupaten Sidoarjo. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03211540000055-Undergraduate_Theses.pdf]
Preview
Text
03211540000055-Undergraduate_Theses.pdf

Download (3MB) | Preview

Abstract

Target pengelolaan sampah menurut Peraturan Bupati Sidoarjo No. 100 Tahun 2018 adalah 100% pada tahun 2025, sedangkan persentase pelayanan sampah di Kabupaten Sidoarjo pada tahun 2017 hanya 55%. Perencanaan ini bertujuan untuk merencanakan pengumpulan dan Tempat Penampungan Sementara (TPS) sampah guna meningkatkan persentase pelayanan sampah dan juga menghitung biaya iuran sampah di Kecamatan Taman Kabupaten Sidoarjo. Perencanaan ini meliputi analisis timbulan, densitas, dan komposisi sampah rumah tangga. Kemudian direncanakan pengelolaan sampah meliputi pewadahan, pengumpulan, dan TPS sampah. Terdapat lima tahapan dalam perencanaan ini, yang pertama adalah ide awal perencanaan yang didapat dari kondisi lapangan yang tidak sesuai dengan kondisi ideal. Kedua adalah studi pendahuluan meliputi jurnal penelitian, textbook literatur pengelolaan sampah, dan peraturan pemerintah. Ketiga adalah pengumpulan data primer dan sekunder. Data primer meliputi timbulan, densitas dan komposisi sampah yang diukur langsung di sumber sampah rumah tangga dan 8 hari berturut-turut. Data sekunder adalah peta wilayah penelitian, data kependudukan dan data pengelolaan sampah eksisting yang didapat dari pemerintah setempat. Keempat adalah analisis data dan pembahasan. Hal-hal yang dibahas di hasil perencanaan adalah timbulan, komposisi, dan densitas sampah, pewadahan dan pengumpulan sampah serta tempat penampungan sementara (TPS) sampah. Dan yang kelima adalah kesimpulan dari perencanaan ini dan saran untuk perencanaan kedepannya. Analisis yang didapat adalah timbulan sampah Kecamatan Taman sebesar 0,512 kg/orang.hari, densitas sampah sebesar 151,327 kg/m3, komposisi sampah yang diantaranya adalah sampah dapat dikomposkan (57,28%), plastik (16,43%), diapers (11,68%), kain (3,47%), kertas (5,48%), karet (0,21%), limbah B3 (0,32), kaca (0,88%), besi (0,28%), dan lain-lain (0,52%). Dari data-data yang diperoleh, direncanakan TPS berjumlah 13, TPS 3R berjumlah 3, dan TPST berjumlah 3 serta total kendaraan yang digunakan adalah 53 motor roda tiga. Rencana anggaran biaya untuk perencanaan ini sebesar Rp 3.308.839.397,00. Dan untuk iuran yang harus dibayar tiap KK adalah sebesar Rp 7.600,00 /KK.bulan.
================================================================================================================================
Solid waste management service percentage target based on Peraturan Bupati Sidoarjo No. 100 / 2018 is 100% on 2025, while existing service percentage in 2017 only 55%. Planning for solid waste management aim to plan collecting and transfer station to raise the service percentage and calculate charge on solid waste management in Taman District, Sidoarjo. This would include analysis on solid waste generation, density, composition. Then, planned solid waste management including storage, collecting, and transfer facility. There are five steps in designing, first finding intial idea gained from gap between existing condition and ideal condition. Second, preliminary study on research journal, textbook literature, and govenrment regulations. Third is collecting primary data and secondary data. Primary data covers solid waste generation, density, and composition continously in 8 days by direct measuring from household in service area. Secondary data covers map of service area, population data, and existing solid waste management data from local government. Fourth is data analysis and discussion. Case discussed in design results are solid waste generation, composition, waste density, storage, collecting, and transport facility. Fifth is conclusion in design and suggestion for further design.
Analysis results shown in Taman District, Sidoarjo solid waste generation is 0,512 kg/person.hari, waste density of 151,327 kg/m3, waste composition with composition of compostable waste (57,28%), plastic (16,43%), diapers (11,68%), fabric (3,47%), paper (5,48%), rubber (0,21%), hazardous waste (0,32), glass (0,88%), iron (0,28%), and others (0,52%). Data obtained resulting in design of 13 transport facility, 3 3R Transport Facility, and 3 Materials Recovery Facilitiy (MRF). Total vehicle used for collection are 36 three-wheeled motorcycle. Cost estimate budget for design as much as Rp 3.308.839.397,00. Charge on solid waste management is Rp 7.600,00 /household.month.

Item Type: Thesis (Other)
Uncontrolled Keywords: Kecamatan Taman, pelayanan sampah, pengumpulan sampah, perencanaan, Tempat Penampungan Sementara
Subjects: T Technology > TD Environmental technology. Sanitary engineering
T Technology > TD Environmental technology. Sanitary engineering > TD898.8.C67 Waste disposal
Divisions: Faculty of Civil, Environmental, and Geo Engineering > Environmental Engineering > 25201-(S1) Undergraduate Theses
Depositing User: Putra Niko Lovandra
Date Deposited: 01 Oct 2024 02:11
Last Modified: 01 Oct 2024 02:13
URI: http://repository.its.ac.id/id/eprint/66476

Actions (login required)

View Item View Item