Marzuki, Anindya Fitri (2019) Analisis Pemilihan Trase Jalan dengan Menggunakan Program Bantu Trimble Quantum pada Ruas Jalan Malinau - Long Bawan. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
03111540000121-Undergraduate_Theses.pdf Download (10MB) | Preview |
Abstract
Krayan adalah sebuah kecamatan di Kabupaten Nunukan, Kalimantan Utara, Indonesia. Kecamatan Krayan terletak di bagian barat Kabupaten Nunukan dan berbatasan dengan Serawak Malaysia. Akses untuk menuju ke kecamatan tersebut hanya bisa ditempuh dengan transportasi udara melalui penerbangan dari Bandara Nunukan dan Bandara Internasional Juwata Tarakan ke bandara perintis Long Bawan. Meskipun Kecamatan Krayan ini mempunyai akses jalan perbatasan langsung antara Republik Indonesia dengan Malaysia, namun masih dikategorikan daerah terdepan, terluar, tertinggal dan terisolasi. Pada ruas jalan Malinau – Long Bawan sebagian besar sudah dibuka dan sebagian masih berupa jalan tanah. Namun secara fungsi belum bisa dilewati kendaraan dikarenakan pada tempat-tempat tertentu mempunyai alinyemen kelandaian vertikal yang cukup ekstrim sampai dengan 40,0%. Secara topografi trase jalan ini melewati medan yang ekstrim, yaitu berupa pegunungan dengan kemiringan sampai dengan 80o. Dalam hal kondisi medan yang demikian, mencari trase jalan menjadi tidak mudah, karena harus memenuhi syarat standar geometrik, pertimbangan stabilitas badan jalan dan biaya konstruksi. Untuk memastikan tujuan tersebut dapat dicapai, maka dipergunakan alat bantu berupa perangkat lunak bernama “Trimble Quantum”. Dalam tugas akhir ini penulis menganalisis pemilihan trase jalan baru dengan menggunakan program bantu Trimble Quantum pada ruas jalan Malinau – Long Bawan. Analisis pemilihan trase jalan terhadap tiga alternatif relokasi trase jalan baru. Dalam prosesnya, metodologi yang digunakan adalah dengan studi literatur, mengumpulkan data sekunder, menganalisis data keluaran dari Trimble Quantum, dan melakukan pemilihan trase jalan menggunakan metode Analisis Multi Kriteria. Hasil analisis dari tugas akhir ini adalah didapatkan trase jalan baru yang sesuai dengan syarat standar geometrik, pertimbangan stabilitas badan jalan, dan biaya konstruksi yang relatif murah. Trase jalan yang terpilih dengan metode analisis multi kriteria adalah alternatif jalan dengan kecepatan rencana 40 km/jam, dengan total biaya untuk pembangunan jalan ini sebesar Rp 998.000.000.000.
===============================================================================================================================
Krayan is a sub-district in Nunukan District, North Kalimantan, Indonesia. Krayan is located in west of Nunukan and next to Serawak Malaysia. Access to that place only can be reached by plane of flights from Nunukan Airport and Juwata Tarakan International Airport to Long Bawan Airport. Although the Krayan District has direct access between Indonesia and Malaysia, it still categorized as a frontier, outermost, lagging, and isolated area. Most of that roads at Malinau – Long Bawan have been opened and some of that are still soil. But, the vehicle has not been able to pass because in certain places has an extreme vertical alignment that up to 40.0 %. This road has the extreme terrain, which is highlands with slopes up to 80°. In this case, to find the best road is not easy, because it must be fill the geometric standard, consideration of road, and construction cost. To ensure this goal can be achieved, then use a software called “Trimble Quantum”. In this final project, the author analyzes the selection of new road tracks with software called Trimble Quantum in Malinau – Long Bawan road. Analysis of road alignment selection is for three alternatives from relocation for new roads. In the process, the methodology is by studying from literature, collecting the data, analyze the data from the software, and choose the road track using Multi Criteria Analysis. The results of the analysis of this final project is to find a new road alignments that are fill with the geometric standard, consideration of road stability, and low construction costs. The chosen road track by Multi Criteria Analysis method is alternative with a speed of 40 km/hr, and total cost for this alternative road construction is Rp 998.000.000.000.
Item Type: | Thesis (Other) |
---|---|
Additional Information: | RSS 625.7 Mar a-1 2019 |
Uncontrolled Keywords: | Trase jalan, Analisis Multi Kriteria, Trimble Quantum |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses |
Depositing User: | Anindya Fitri Marzuki |
Date Deposited: | 12 Jul 2024 03:35 |
Last Modified: | 12 Jul 2024 03:35 |
URI: | http://repository.its.ac.id/id/eprint/66477 |
Actions (login required)
View Item |