Optimasi Waduk Bendo untuk Pengembangan Potensi PLTA, Dusun Bendo Desa Ngindeng, Kecamatan Sawoo, Kabupaten Ponorogo.

Harianto, Jovin Ilham (2019) Optimasi Waduk Bendo untuk Pengembangan Potensi PLTA, Dusun Bendo Desa Ngindeng, Kecamatan Sawoo, Kabupaten Ponorogo. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000016-Undergraduate_Theses.pdf]
Preview
Text
10111815000016-Undergraduate_Theses.pdf

Download (7MB) | Preview

Abstract

Waduk Bendo terletak di Kabupaten Ponorogo, waduk tersebut direncanakan sebagai penyedia air untuk irigasi, air baku dan pembangkit listrik tenaga air.Pertambahan penduduk dari tahun ke tahun dan potensi lahan irigasi yang dapat dimanfaatkan dengan maksimal tanpa diiringi penambahan jumlah sumber air dan sifat penggunaan air pada masyarakat yang berlebihan saat penghujan menyebabkan kekeringan saat kemarau. Sehingga diharapkan memanfaatkan air yang tersedia secara optimal terutama yang ada di dalam waduk. Karena air yang ada di dalam waduk dapat berguna untuk meningkatkan produktifitas irigasi dan meningkatkan daya pada PLTA. Waduk Bendo Ponorogo yang mempunyai potensi besar untuk dimanfaatkan oleh masyarakat sekitar seperti kebutuhan air baku, irigasi, dan untuk PLTA. Dari dua hasil optimasi didapatkan intensitas tanam 252% dan 300%, dengan merencanakan skenario pada setiap awal bulan dilakukan rencana kegiatan awal tanam padi dan untuk polowijo rencana kegiatan awal tanam dilakukan hanya pada bulan Juni, Juli dan Agustus, yang menghasilkan kebutuhan air bersih sebesar 200,02 ltr/s. Dalam perencanaan pembangkit listrik tenaga air di Waduk Bendo analisa awal yang dilakukan adalah analisis debit dimana debit inflow berasal dari debit kebutuhan air irigasi dan kebutuhan air baku. Selanjutnya dilakukan analisis tinggi jatuh bruto berdasarkan data perencanaan bendungan Bendo dan perencanaan bangunan pembangkit yang meliputi, pipa pesat (penstock), surge tank dan jenis turbin yang akan digunakan. Analisa selanjutnya adalah analisis kehilangan energi yang terjadi pada bangunan pembangkit untuk mengetahui tinggi jatuh efektif yang kemudian dilakukan penggambaran gambar kerja berdasarkan hasil perencanaan bangunan pembangkit. Kemudian analisis daya listrik, energi listrik yang dapat dihasilkan, energi yang dihasilkan PLTA sebesar 2,47288 MW/s.
=================================================================================================================================
Bendo Reservoir is located in Ponorogo District, it is planned as a provider of water for irrigation, raw water and hydroelectric power. The increase in population from year to year and the potential of irrigation land that can be utilized with maximum without accompanied by the addition of water resources and the nature of water use in excessive communities when rainfall causes drought during the drought. So it is expected to utilize the water available optimally especially those in the reservoir. Because the water in the reservoir can be useful to increase the productivity of the irrigation and increase the power of the PLTA. Bendo Ponorogo Reservoir has great potential to be utilized by local people such as raw water, irrigation, and PLTA. From the two optimization results obtained the planting intensity 252% and 300%, by planning the scenario at the beginning of each month the initial activity plan of rice planting and to bank initial planting activities plan conducted only in June, July and August, Which produces the need for clean water of 200.02 ltr/S. In planning the hydropower plant in Bendo reservoir The initial analysis conducted is a discharge analysis where the inflow discharge is derived from the discharge of irrigation water needs and the needs of raw water. Furthermore, high analysis of Gross falls based on Bendo Dam planning data and building planning plant covers, rapid pipes (penstock), surge tanks and turbine types to be used. The next analysis is an analysis of the energy loss that occurs in the building of plants to know the high effective fall which is then done depictions of work images based on the construction of the building. Then the analysis of electrical power, the electrical energy that can be produced, the energy generated by the PLTA 2.47288 MW/S.

Item Type: Thesis (Diploma)
Additional Information: RSIS 627.8 Har o-1 2019
Uncontrolled Keywords: Waduk Bendo, PLTM, Irigasi dan Air Baku Bendo Reservoir, Irigation and Raw Water
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Jovin Ilham Harianto
Date Deposited: 19 Mar 2024 02:04
Last Modified: 19 Mar 2024 02:04
URI: http://repository.its.ac.id/id/eprint/67217

Actions (login required)

View Item View Item