Analisa Teknis Kriteria Seleksi Galangan Kapal untuk Pembangunan Kapal Baru dengan Metode Analytic Network Process

Abdillah, Fikrohul Hasbi (2019) Analisa Teknis Kriteria Seleksi Galangan Kapal untuk Pembangunan Kapal Baru dengan Metode Analytic Network Process. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04111440000072-Undergraduate_Theses.pdf]
Preview
Text
04111440000072-Undergraduate_Theses.pdf

Download (4MB) | Preview
[thumbnail of 04111440000072-Undergraduate_Theses.pdf]
Preview
Text
04111440000072-Undergraduate_Theses.pdf

Download (3MB) | Preview

Abstract

Proses seleksi galangan untuk pembangunan kapal baru memiliki kriteria dan sub-kriteria yang harus dipenuhi. Kondisi saat ini pemilik kapal belum menentukan kriteria dan sub-kriteria yang menjadi skala prioritas. Selain itu, terjadinya keterlambatan waktu pembangunan oleh beberapa galangan yang telah terpilih dan kurang tercapainya keinginan dari pemilik kapal dalam hal kualitas serta harga. Tujuan penelitian ini untuk menganalisa faktor-faktor yang mempengaruhi dalam proses pembangunan dan mengevaluasi dari kriteria dan sub-kriteria seleksi galangan kapal sebelumnya. Metode Analytic Network Process (ANP) merupakan metode penilaian pada multi kriteria untuk mengukur konsistensi dari penilaian yang digunakan untuk menentukan kriteria dan sub-kriteria yang menjadi skala prioritas. Langkah pertama yaitu mengevaluasi kriteria dan sub-kriteria sebelumnya. Langkah kedua, penyusunan kuisioner untuk mengetahui hubungan keterkaitan antar kriteria dengan kriteria, dan sub-kriteria dengan sub-kriteria. Langkah terakhir dengan penyusunan kuisioner untuk pembobotan antar elemen. Hasil evaluasi pada pemilihan galangan kapal untuk pembangunan kapal baru adalah: manajemen galangan (manajemen keuangan, perencanaan pembangunan kapal, beban kerja saat ini), pengalaman (pembangunan tepat waktu), lokasi (jarak galangan ke tempat tujuan, ketersediaan material) dan proses pembangunan. Hasil penelitian didapatkan 5 kriteria yang dipertimbangkan, yaitu manajemen galangan, pengalaman, lokasi, proses pembangunan dan kemampuan teknis serta 16 sub-kriteria yang terkandung di dalamnya. Penggunaan metode ANP untuk mendapatkan nilai bobot setiap kriteria dan sub-kriteria. Dengan metode ANP, kriteria dengan nilai bobot tertinggi yaitu manajemen galangan memiliki bobot sebesar 35,1% dan sub-kriteria dengan nilai bobot tertinggi yaitu perencanaan pembangunan memiliki bobot sebesar 15,8%.
==========================================================
Shipyard selection process has criteria and sub-criteria that must be met. These days ship owners has not yet determined the criteria and sub-criteria which become the priority scale. In addition, there is a delay in the time of construction by selected shipyards and lack of achievement of the wishes of the ship owners in terms of quality and price. The purpose of this study is to analyze the factors that influence the development process and the evaluation of the previous shipyard selection criteria. The Analytic Network Process (ANP) method is a valuation method on multi criteria to measure the consistency of assessment that used to determine criteria and sub-criteria which become priority scale. The first step is evaluating the previous criteria and sub-criteria. The second step is preparing the questionnaires to find out the relationship between criteria to criteria and sub-criteria to sub-criteria. The final step is preparing questionnaire for weighting between elements. The evaluation results on the selection of shipyards for the construction of new vessels are: shipyard management (financial management, ship building planning, current workload), experience (timely development), location (distance to the destination, material availability), development process. The study resulted in 5 criterias considered, namely shipyard management, experience, location, building process and technical capabilities with 16 sub-criterias contained in it. Using the ANP method to get each criteria and sub-criteria has a weight value. Using the ANP method, criteria with the highest weight values are shipyard management has a weight of 35.1%, and sub-criteria with the highest weighting values are building planning has a weight of 15.8%.

Item Type: Thesis (Other)
Uncontrolled Keywords: Shipyard Selection, Criteria, ANP.
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM298.5 Shipbuilding industri. Shipyards
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Hasbi Fikrohul
Date Deposited: 14 Jun 2024 03:53
Last Modified: 14 Jun 2024 03:56
URI: http://repository.its.ac.id/id/eprint/67405

Actions (login required)

View Item View Item