Rencana Pengoperasian Pintu Air Bendung Gerak Sembayat Untuk Optimasi Irigasi, Air Bersih dan Pengendali Banjir

Ikhsan, Muhammad Yusri Maulana (2019) Rencana Pengoperasian Pintu Air Bendung Gerak Sembayat Untuk Optimasi Irigasi, Air Bersih dan Pengendali Banjir. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000009-Undergraduate_Theses.pdf]
Preview
Text
10111815000009-Undergraduate_Theses.pdf

Download (7MB) | Preview

Abstract

Tugas Akhir Terapan ini bertujuan untuk merencanakan pengoperasian bendung gerak Sembayat. Dikarenakan kondisi debit sungai yang melimpah disaat musim hujan dan apabila saat musim kemarau debit nya menurun drastis. Oleh karena itu tujuan dari pengoperasian bendung gerak Sembayat yaitu menampung air saat debit masuk dan membuang debit banjir saat musim penghujan. Air yang ditampung dapat dimanfaatkan untuk keperluan irigasi dan air baku. Metode yang dilakukan dalam pengerjaan Tugas Akhir Terapan ini pertama kali adalah menghitung kebutuhan air untuk tanaman dan kebutuhan air untuk air bersih. Selanjutnya dilakukan analisa optimasi irigasi sehingga dapat direncankan pola pengoperasian pintu air bendung gerak Sembayat. Langkah berikutnya adalah merencanakan jadwal untuk pengoperasian pintu air bendung. Hasil dari Tugas Akhir Terapan ini adalah pengoperasian pintu air yang menghasilkan tampungan sebesar 175803.5 m3 yang dapat dimanfaatkan untuk keperluan air bersih dan menaikan intensitas tanam menjadi 300%.
=================================================================================================================================
This Final Project aims to plan the operation of the Sembayat dam. Due to the abundant conditions of the river discharge during the rainy season and dry season the discharge drops dramatically. Therefore the purpose of the Sembayat motion dam is to hold water at the time of incoming discharge and dispose of the flood discharge during the rainy season. The collected water can be used for irrigation and raw water purposes. The method that is carried out in the implementation of this Final Project is to calculate the water requirements for plants and the need for water for clean water. Furthermore, an optimization analysis of irrigation is carried out, so that it can be planned the operation pattern of the Sembayat weir sluice. The next step is to plan a schedule for the operation of the dam sluice. The result of this Final Project is the operation of sluice gates which produce a storage of 175803.5 m3 which can be used for clean water purposes and increase the planting intensity to 300%.

Item Type: Thesis (Diploma)
Additional Information: RSIS 627.8 Ikh r-1 2019
Uncontrolled Keywords: Motion Dam Operation, Irrigation Optimization and Raw Water
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TC Hydraulic engineering. Ocean engineering > TC530 Flood control
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Muhammad Yusri Maulana Ikhsan
Date Deposited: 18 Mar 2024 07:03
Last Modified: 18 Mar 2024 07:03
URI: http://repository.its.ac.id/id/eprint/67580

Actions (login required)

View Item View Item