Perkuatan Struktur Jalan Pada Ruas Jalan Kabupaten Tuban Wilayah Selatan Dengan Struktur Perkerasan Lentur

Arifani, Ria (2019) Perkuatan Struktur Jalan Pada Ruas Jalan Kabupaten Tuban Wilayah Selatan Dengan Struktur Perkerasan Lentur. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000024_Undergraduate_Thesis.pdf] Text
10111815000024_Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (16MB) | Request a copy

Abstract

Kabupaten Tuban merupakan kabupaten yang berada di Pulau Jawa tepatnya di Selatan Laut Jawa dan berbatasan langsung dengan Kabupaten Bojonegoro. Ruas jalan pada Kabupaten Tuban banyak dilintasi kendaraan dari jalur pantura (pantai utara) yang notabene merupakan lalu lintas dengan beban kendaraan yang tinggi. Seiring dengan berjalannya waktu, kapasitas jalan akan mengalami penurunan karena aktivitas lalu lintas yang tinggi dan beban kendaraan yang berat. Selain itu, kondisi tanah pada Kabupaten Tuban memiliki nilai kembang susut relatif tinggi dimana pada saat musim penghujan tanah mengembang dan pada musim kemarau tanah mengalami susut hingga retak. Sehingga kondisi jalan mengalami penurunan dan membutuhkan perkuatan struktur pada tanah dan perkerasan jalan. Mengacu pada latar belakang di atas, tugas akhir ini akan merencanakan tebal lapis tambah (overlay) perkerasan lentur berdasarkan SNI 03-1732-1989 tentang Petunjuk Perencanaan tebal perkerasan lentur jalan raya dengan metode analisa komponen. Penentuan dimensi drainase berdasarkan SNI 03-3424-1994 tentang tata cara perencanaan drainase permukaan jalan. Perencanaan dinding penahan tanah berdasarkan SNI 8460-2017 tentang persyaratan perancangan geoteknik. Menyusun metode pelaksanaan struktur perkerasan lentur secara umum dan memperhitungan rencana anggaran biaya menurut HSPK Kabupaten Tuban tahun 2018. Dalam tugas akhir ini diharapkan hasil analisa kerusakan jalan dapat diperkuat dengan metode tebal lapis tambah perkerasan lentur yang telah direncanakan sesuai dengan nilai ITPrencana < ITPaktual. Dari hasil perhitungan tebal lapis tambah pada Ruas Jalan Kabupaten Tuban Wilayah Selatan dibagi menjadi tiga kelompok yaitu dengan ketebalan 5 cm, 9 cm dan 17 cm. Perencanaan saluran tepi pada Ruas Jalan Kabupaten Tuban Wilayah Selatan diperoleh dimensi dengan lebar dasar saluran (b) 0,3 m dan tinggi saluran (h) 0,5 m. Rencana anggaran biaya yang dibutuhkan untuk perkuatan struktur jalan dengan struktur perkerasan lentur pada Ruas Jalan Kabupaten Tuban Wilayah Selatan sebesar Rp 662.276.511.972,40. ====================================================================================================================================
Tuban is a regency located on Java Island, precisely in the South Java Sea and directly adjacent to Bojonegoro. Many roads in Tuban Regency are crossed by vehicles from the northern coastline (Pantura), which is traffic with a high vehicle load. Over time, road capacity will decline due to high traffic activities and heavy vehicle loads. Besides, soil conditions in Tuban have a relatively high shrinkage rate were during the rainy season the soil expands and during the dry season the soil experiences shrinkage to crack. So that the road conditions have decreased and required reinforcement of the structure on the ground and pavement. Referring to the background above, this final project will plan a flexible pavement overlay thickness based on SNI 03-1732-1989 about Guidelines for Planning flexible highway pavement thickness with component analysis method. Determination of drainage dimensions based on SNI 03-3424-1994 concerning procedures for planning road surface drainage. Planning of retaining walls based on SNI 8460-2017 concerning requirements for geotechnical design. Develop methods for implementing flexible pavement structures in general and calculate the budget plan according to HSPK in Tuban in 2018. In this final project, it is expected that the results of the analysis of road damage can be strengthened by the thick flexible pavement layer added method that has been planned following the value of the PTIplanned <PTIactual. From the calculation of the added layer thickness on the Tuban Road Section the Southern Region is divided into three groups, namely with a thickness of 5 cm, 9 cm, and 17 cm. Drainage planning in the Tuban Road Section in the Southern Region obtained dimensions on the channel edge with a channel width (b) 0.3 m and channel height (h) 0.5 m. The budget plan needed to strengthen the road structure with a flexible pavement structure on the Tuban Regency Road Section in the Southern Region is Rp 662.276.511.972,40.

Item Type: Thesis (Other)
Uncontrolled Keywords: Overlay, Road in Southern Part of Tuban.
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE175 Road and highway design
Divisions: Faculty of Vocational > 22401-Civil Infrastructure Engineering (D3)
Depositing User: Ria Arifani
Date Deposited: 11 Aug 2026 01:16
Last Modified: 11 Aug 2026 01:16
URI: http://repository.its.ac.id/id/eprint/67628

Actions (login required)

View Item View Item