Analisa Teknis dan Ekonomis Re-Layout Galangan Kapal untuk Meningktakan Kapasitas Produksi

Noerwidyanto, Nova Eka (2019) Analisa Teknis dan Ekonomis Re-Layout Galangan Kapal untuk Meningktakan Kapasitas Produksi. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04111440000083-Undergraduate_Theses.pdf]
Preview
Text
04111440000083-Undergraduate_Theses.pdf

Download (7MB) | Preview

Abstract

Dalam sebuah galangan kapal, tata letak fasilitas produksi merupakan salah satu faktor kunci yang dapat menentukan produktifitas tata letak fasilitas yang baik dan sesuai dengan keadaan perusahaan merupakan salah satu faktor utama untuk mengoptimalkan waktu, biaya produksi dan proses produksi. Selain itu ada juga faktor yang mengakibatkan produksi kapal melemah, yaitu terjadinya pengurangan lahan pada suatu galangan kapal. Pada situasi ini lahan galangan kapal berkurang 1,5 Ha pada area selatan galangan kapal sehingga kapasitas produksinya menjadi berkurang. Ketika hal ini terjadi maka akan menjadi suatu permasalahan yang harus segera diselesaikan dengan cara melakukan relayout dan menambah fasilitas pada galangan kapal tersebut. Untuk meningkatkan kembali kapasitas produksi galangan kapal tersebut, hal yang perlu dilakukan adalah pertama melakukan survei ke galangan kapal lalu memeriksa setiap area galangan untuk melihat lokasi kemudian menentukan justifikasi bagian mana yang akan dibongkar dan dibangun. Kedua, yang harus dilakukan adalah membuat desain layout usulan bertahap yaitu tahap satu untuk lambung utara dan tahap dua untuk lambung selatan. Dan yang ketiga yaitu menghitung biaya investasi untuk mengetahui seberapa besar biaya yang akan digunakan untuk menjalankan proses relayout tersebut. Setelah melakukan relayout, kapasitas produksi galangan kapal menjadi naik karena bertambahnya fasilitas galangan kapal berupa satu building berth berkapasitas 6500 DWT di area lambung selatan dan area erection untuk pembangunan kapal alumunium dan tug boat di area lambung utara. Proses relayout ini menghabiskan biaya investasi sebesar Rp 87.474.070.950. Untuk analisa ekonomis, investasi pada relayout ini menghasilkan nilai Return on Investment sebesar Rp 15.634.261.790 yang kembali selama 6 tahun 3 bulan dengan nilai Internal Rate of Return 12,27%.
========================================================================================================================
In a shipyard, the layout of production facilities is one of the key factors that can determine the productivity of the layout of facilities that are good and in accordance with the state of the company is one of the main factors to optimize time, production costs and production processes. In addition there are also factors that cause ship production to weaken, namely the reduction of land in a shipyard. In this situation, shipyard land was reduced by 1.5 ha in the southern area of the shipyard so that its production capacity was reduced. When this happens it will become a problem that must be resolved immediately by conducting relayout and adding facilities to the shipyard. To increase the production capacity of the shipyard, what needs to be done is first to survey the shipyard then examine each shipyard area to see the location and determine the justification for which parts to be dismantled and constructed. Second, what must be done is to make the design of the proposed layout in stages, namely stage one for the northern hull and stage two for the southern hull. And the third is to calculate the investment cost to find out how much it will cost to run the relayout process. After relaying, shipyard production capacity increased due to the increase in shipyard facilities in the form of one building with a capacity of 6500 DWT in the southern hull area and an erection area for the construction of aluminum vessels and tug boats in the northern hull area. This relayout process costs an investment of Rp 87,474,070,950. For economic analysis, investment in this relayout results in a Return on Investment value of Rp. 15,634,261,790 which returns for 6 years and 3 months with the value of Internal Rate of Return 12.27%.

Item Type: Thesis (Other)
Uncontrolled Keywords: Relayout, Galangan kapal, Kapasitas produksi.
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM298.5 Shipbuilding industri. Shipyards
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Noerwidyanto Nova Eka
Date Deposited: 14 Jun 2024 01:01
Last Modified: 14 Jun 2024 01:02
URI: http://repository.its.ac.id/id/eprint/67872

Actions (login required)

View Item View Item