Pemanfaatan Kali Bangiltak Sebagai Penampungan Sementara Luapan Kali Wrati Untuk Banjir Di Kawasan Kedungboto, Beji, Kabupaten Pasuruan

Darmawan, Luqman Khoiruddin (2018) Pemanfaatan Kali Bangiltak Sebagai Penampungan Sementara Luapan Kali Wrati Untuk Banjir Di Kawasan Kedungboto, Beji, Kabupaten Pasuruan. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111815000054-Undergraduate_Thesis.pdf] Text
10111815000054-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy

Abstract

Kali Bangiltak merupakan kali yang didesain untuk melimpaskan sebagian banjir dari Kali Porong, namun karena tidak adanya limpasan dari Kali Porong maka aliran air yang ke Kali Bangiltak tidak ada, kecuali dari air hujan saja. Banjir yang menggenangi permukiman dan lahan pertanian di Kawasan Kedungboto merupakan permasalahan yang terjadi akibat meluapnya Kali Wrati. Kajian ini bertujuan untuk mengetahui potensi Kali Bangiltak sebagai tampungan sementara luapan Kali Wrati, serta mengetahui lokasi interkoneksi yang layak untuk kondisi di lapangan. Metodologi pada studi kasus ini adalah pengumpulan data, analisa hidrologi, analisa profil muka air dan analisa reduksi banjir. Metode yang digunakan untuk perhitungan debit banjir rencana adalah Gama I. Program yang digunakan pada analisa studi ini adalah ArcGis dan HecRas. Hasil kajian menunjukan Kali Bangiltak memiliki kapasitas tampungan sebesar 1.799.169,32 m3. Sistem pengendalian banjir yang diusulkan adalah dengan melakukan sudetan pada Patok 125, Patok 180, dan Patok 213 di Kali Wrati. Volume banjir dari Kali Wrati yang masuk ke Kali Bangiltak sebesar 1.841.150,4 m³. Dengan lebih besarnya volume banjir daripada tampungan maka perlu penanganan agar Kali Bangiltak dapat menampung volume banjir Kali Wrati. Alternatif pertama yaitu dengan direncanakan bendung pada hilir Kali Bangiltak dengan elevasi mercu +0,00 m dan lebar bendung 30 m. Alternatif kedua untuk mengosongkan air yang tertahan pada Kali Bangiltak yaitu dengan pengoperasian pompa. Pompa yang dibutuhkan sebanyak 3 pompa dengan kapasitas masing-masing 10 m3/detik. Pompa dinyalakan selama 16 jam dan dioperasikan apabila elvasi muka air pada hilir bendung dalam keadaan surut.
================================================================== Bangiltak River is a river designed to partially flood the Porong River, but because there is no runoff from Porong River, there is no water flow to Bangiltak River, except rainwater. The floods that inundated settlements and agricultural land in the Kedungboto area were problems that occurred due to the overflowing of Kali Wrati. This study aims to determine the potential of the Bangiltak River as a temporary reservoir for the Wrati River, and to find out the proper interconnection location for conditions in the field. The methodology in this case study is data collection, hydrological analysis, water level profile analysis and flood reduction analysis. The method used for calculating the planned flood discharge is Gama I. The programs used in the analysis of this study are ArcGis and HecRas. The results of the study show that Bangiltak River has a storage capacity of 1,799,169.32 m3. The proposed flood control system is to do a line on the 125 peg, peg 180 and peg 213 in the Wrati River. The flood volume from Wrati River which enters the Bangiltak River is 1,841,150.4 m³. With more flooding volume than the reservoir, it is necessary to handle the Bangilak River to accommodate the flood volume of Wrati River. The first alternative is planned for a dam downstream of Bangiltak with mercury elevation + 0.00 m and weir width 30 m. The second alternative to emptying water that is held back in the Bangiltak River is by operating the pump. The pumps needed are 3 pumps with a capacity of 10 m3 / second. The pump is switched on for 16 hours and is operated when the water level elevation in the weir downstream is receding.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: flood control, river, interconnection.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering > TC530 Flood control
Divisions: Faculty of Vocational > 22401-Civil Infrastructure Engineering (D3)
Depositing User: Darmawan Luqman Khoiruddin
Date Deposited: 11 Aug 2026 03:34
Last Modified: 11 Aug 2026 03:34
URI: http://repository.its.ac.id/id/eprint/68031

Actions (login required)

View Item View Item