Abstract

Saluran Kali Konang yang terdapat di wilayah Kecamatan Babat merupakan saluran yang menampung debit banjir dari Kelurahan Babat dan Rawa Sogo yang akan mengarah ke sistem tampungan Rawa Semando. Saluran Kali Konang sering tergenang banjir. Tinggi genangan pada saluran Kali Konang mencapai 20 cm. Berdasarkan hasil analisis hidrologi dan hidrolika, banjir di Kali Konang terjadi akibat beberapa bagian di Kali Konang tidak dapat menampung debit banjir yang terjadi. Oleh sebab itu perlu dikaji bagaimana pengendalian banjir yang paling efektif untuk menangani banjir di saluran Kali Konang. Analisis yang dilakukan pada Tugas Akhir ini meliputi analisis hidrologi, analisis hidrolika, dan analisis kapasitas tampungan. Analisis hidrologi memperhitungkan curah hujan rencana dengan distribusi Log Person Type III periode ulang dua dan lima tahun, serta perhitungan debit banjir rencana menggunakan metode Rasional untuk mengetahui debit banjir rencana tiap saluran dan menggunakan HSS Nakayassu untuk mengetahui debit jam-jaman untuk pengendalian Rawa Sogo. Perhitungan analisis hidrolika dilakukan untuk mengetahui kapasitas eksisting penampang saluran. Berdasarkan hasil analisa hidrologi didapatkan curah hujan harian rencana periode ulang 2, 5, dan 10 tahun sebesar 99,29, 114,80, dan 123,43 mm yang akan digunakan untuk menghitung debit rencana dengan metode Rasional. Untuk mengevaluasi saluran terlebih dahulu dilakukan perhitungan kapasitas saluran dengan dimensi existing yang ada di lokasi studi. Dari hasil evaluasi saluran didapatkan bahwa bagian saluran tersier dan sekunder Kali Konang meluber, yaitu saluran tersier Gotong Royong dan saluran Kali Konang ruas 7 dan 8. Pengendalian banjir yang dilakukan pada Tugas Akhir ini adalah dengan menormalisasi saluran. Namun pada saluran Kali Konang ruas 7 tidak dapat dilakukan normalisasi karena lokasi saluran yang berdempetan dengan tanggul Rawa Sogo dan pemukiman warga. Oleh sebab itu, pengendalian banjir alternatif yang dilakukan pada saluran tersebut adalah dengan cara mengalirkan debit banjir yang mengarah ke saluran tersebut menuju ke Rawa Sogo.
===========================================================================================================================
The Konang River Channel in Babat Subdistrict is a channel that accommodates flood discharge from Babat Village and Rawa Sogo, which flows into the Semando Swamp reservoir system. The Konang River Channel is frequently flooded, with inundation depths reaching 20 cm. Based on the results of hydrological and hydraulic analyses, flooding in the Konang River occurs because several sections of the channel are unable to accommodate the flood discharge. Therefore, it is necessary to determine the most effective flood control method to overcome flooding in the Konang River Channel. The analyses carried out in this Final Project include hydrological analysis, hydraulic analysis, and storage capacity analysis. The hydrological analysis calculates the design rainfall using the Log Pearson Type III distribution for 2- and 5-year return periods and determines the design flood discharge using the Rational Method for each channel, while the Nakayasu Synthetic Unit Hydrograph (HSS Nakayasu) is used to estimate hourly discharge for Rawa Sogo control. The hydraulic analysis is performed to determine the existing capacity of the channel cross-sections. Based on the hydrological analysis, the design daily rainfall for the 2-, 5-, and 10-year return periods was found to be 99.29 mm, 114.80 mm, and 123.43 mm, respectively, which were then used to calculate the design discharge using the Rational Method. The existing channel capacity was first evaluated using the existing dimensions at the study location. The evaluation showed that the tertiary and secondary sections of the Konang River overflowed, specifically the Gotong Royong tertiary channel and Sections 7 and 8 of the Konang River. The proposed flood control measure in this Final Project is channel normalization. However, normalization could not be implemented in Section 7 of the Konang River because the channel is located adjacent to the Rawa Sogo embankment and residential areas. Therefore, an alternative flood control measure was proposed by diverting the flood discharge that flows toward the channel into Rawa Sogo.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pengendalian, Rawa, Kali Konang, Rawa Sogo, Banjir, Pintu Air
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC530 Flood control
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22401-(D3) Diploma 3