Penentuan Prioritas Proyek Penggantian Transformator Tenaga dengan Menggunakan Metode Fuzzy dan AHP

Harianti, Shanti (2019) Penentuan Prioritas Proyek Penggantian Transformator Tenaga dengan Menggunakan Metode Fuzzy dan AHP. Masters thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 09211750023014-Master_Thesis.pdf]
Preview
Text
09211750023014-Master_Thesis.pdf

Download (3MB) | Preview

Abstract

Saat ini listrik merupakan kebutuhan primer yang harus digunakan, karena akan memicu perkembangan ekonomi suatu daerah dan negara. Dalam distribusi tenaga listrik, trafo adalah salah satu aset terpenting karena dapat mengubah level tegangan hingga dapat didistribusikan, juga merupakan aset paling mahal dari semua peralatan di gardu induk. Biaya investasi yang mahal dari sebuah transformator menyebabkan prioritas harus diganti sesuai dengan tingkat urgensi, sehingga biaya yang akan dikeluarkan sebanding dengan pengembalian yang diperoleh. Dengan mengetahui kondisi trafo sejak dini dapat mencegah terjadinya gangguan yang dapat menyebabkan listrik padam atau mati. KEPDIR 149 tentang penggantian Material Transmisi Utama dan dalam hal ini terdiri dari kriteria yang digunakan untuk melakukan penggantian untuk PLN. Metode fuzzy digunakan untuk menentukan kriteria kondisi teknis suatu trafo yang selanjutnya mengeliminasi kondisi yang baik, sedangkan metode AHP selanjutnya yang digunakan untuk memprioritaskan penggantian trafo berdasarkan kondisi usia operasi dan tingkat risiko. Hasil penelitian menunjukkan bahwa usia operasi memiliki pengaruh terbesar karena mereka memiliki bobot 0,6, dan 0,4 untuk kriteria tingkat risiko berdasarkan wawancara manajemen puncak. Sedangkan untuk transformator daya B yakni Trafo 5 Buduran mendapatkan prioritas tertinggi untuk dilakukan penggantian.
==================================================================================================================================
At present electricity is a primary need that must be used, because it will trigger the economic development of a region and country. In electric power distribution, the transformer is one of the most important assets because it can change the voltage level until it can be distributed, it is also the most expensive asset of all equipment in the substation. The expensive investment costs of a transformer cause priority to be replaced in accordance with the level of urgency, so that the costs incurred are proportional to the returns obtained. By knowing the condition of the transformer early on, it can prevent the occurrence of interference that can cause the electricity to turn off or die. KEPDIR 149 concerning replacement of Main Transmission Equipment and in this case the transformer contains the criteria used to make a replacement for PLN. Fuzzy method is used to determine the technical conditions of a transformer which then eliminates good conditions, while the next AHP method is used to prioritize the replacement of transformers based on operating age conditions and risk levels. The results showed that operating age had the greatest influence because they had a weight of 0.6, and 0.4 for the risk level criteria based on top management interviews. As for the B power transformer, the Buduran 5 Transformer gets the highest priority for replacement.

Item Type: Thesis (Masters)
Additional Information: RTMT 621.314 Har p-1
Uncontrolled Keywords: Transformator, Duval, Material Transmisi Utama, Fuzzy, AHP
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK6565.T7 Transformers
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis
Depositing User: Harianti Shanti
Date Deposited: 26 Mar 2025 01:55
Last Modified: 26 Mar 2025 01:55
URI: http://repository.its.ac.id/id/eprint/68346

Actions (login required)

View Item View Item