Setyaningrum, Endah (2019) Analisis Risiko Pemasangan Kabel Bawah Laut Antara Landing Point Pangkalan Susu dan Pulau Sembilan, Langkat, Sumatera Utara. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
04311540000057-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
Pada proses instalasi kabel bawah laut tentu mengandung banyak risiko yang dapat menghambat berlangsungnya proyek hingga kemungkinan menyebabkan kegagalan. Pada penelitian tugas akhir ini, penulis menganalisis risiko pemasangan kabel laut yang diinstal diantara landing point Pangkalan Susu dan Pulau Sembilan, Langkat, Sumatera Utara. Untuk hasil analisis menggunakan metode FTA didapatkan hasil total peluang kejadian top event sebesar 0,19134, sedangkan untuk hasil analisis menggunakan ETA didapatkan hasil yaitu proyek pemasangan kabel laut dapat dikatakan safe karena tidak mengalami kecelakaan pekerja akibat telah melaksanakan safety barrier dengan baik, kemudian proyek kabel laut terlambat selama 1 tahun – 3 tahun lamanya karena performa kontraktor yang buruk akibat tidak menjalin kerjasama dengan kontraktor yang profesional dan berpengalaman, dan dampak lain yang dapat ditimbulkan adalah overcost, penurunan kredibilitas perusahaan (kontraktor) dan stress pada seluruh pihak terkait akibat pressure yang tinggi akibat terjadinya keterlambatan proyek. Sedangkan diagram bowtie sendiri didapat dari mengkombinasikan metode FTA dan ETA, barrier yang ditetapkan untuk tindakan pencegahan ancaman didapat dari hasil metode fault tree analysis dan barrier untuk tindakan pemulihan atau pengurangan konsekuensi dari hasil event tree analysis pada proyek pemasangan kabel bawah laut.
================================================================================================================================
The installation of submarine cables involves numerous risks that may hinder project progress and potentially lead to project failure. This study assesses the risks associated with the installation of a submarine power cable between the landing points at Pangkalan Susu and Pulau Sembilan, North Sumatra. Risk analysis was conducted using the Fault Tree Analysis (FTA), Event Tree Analysis (ETA), and Bowtie methods. The FTA results indicate that the probability of the top event occurring is 0.19134. The ETA results show that the project can be considered safe when appropriate safety barriers are effectively implemented. However, inadequate contractor performance, particularly due to the lack of collaboration with experienced and qualified contractors, may result in project delays of one to three years. Additional consequences include cost overruns, reduced contractor credibility, and increased stress among project stakeholders due to schedule delays. The Bowtie analysis integrates the results of the FTA and ETA, where preventive barriers are derived from the identified fault scenarios in the FTA, while recovery and consequence mitigation barriers are established based on the outcomes of the ETA, providing a comprehensive framework for risk management throughout the submarine cable installation project.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Pemasangan Kabel Bawah Laut, Fault Tree Analysis, Event Tree Analysis, Bowtie Analysis |
| Subjects: | T Technology > T Technology (General) > T174.5 Technology--Risk assessment. T Technology > TC Hydraulic engineering. Ocean engineering |
| Divisions: | Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis |
| Depositing User: | Endah Setyaningrum |
| Date Deposited: | 26 May 2026 04:37 |
| Last Modified: | 23 Jul 2026 08:42 |
| URI: | http://repository.its.ac.id/id/eprint/68709 |