Ramadhani, Gita Fitri (2019) Perencanaan Ulang Belt Conveyor Pengangkut Abu Ampas Tebu Dengan Kapasitas 230 Ton/Jam Di PG Gempolkrep Mojokerto. Diploma thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10211600000100-Non_Degree.pdf Restricted to Repository staff only Download (6MB) | Request a copy |
Abstract
Belt conveyor pengangkut abu ampas tebu di PG Gempolkrep digunakan untuk memindahkan abu ampas tebu dari stasiun ketel menuju gudang ampas. Adanya belt conveyor tersebut mempermudah dan mempersingkat waktu pekerjaan. Namun, karena PG Gempolkrep merupakan pabrik gula yang sudah tua, peralatan yang ada di sana pun juga sudah sangat lama sehingga performansinya menurun. Oleh karena itu, pada buku ini akan merencanakan tentang belt dan roller idler yang kemudian akan didapatkan daya motor penggerak yang dibutuhkan, juga perhitungan pada rantai dan sproket. Langkah awal untuk melakukan penelitian ini adalah melalui tahap studi literatur dan observasi lapangan di PG Gempolkrep Mojokerto. Setelah itu dilakukan pengambilan data dan melakukan perencanaan, kemudian dilanjutkan dengan perhitungan dan didapatkan kesimpulan. Dari hasil perencanaan dan perhitungan, belt conveyor ini dapat diketahui bahwa daya motor yang diperlukan sebesar 7,36 kW atau sebesar 9,86 hp sehingga digunakan motor lisrik dengan daya 10 hp untuk menggerakkan belt conbeyor. Digunakan belt dengan panjang 49,57 meter dan rantai dengan nomor 100 yang memiliki kecepatan 0,490 m/s dengan panjang 2131,98 mm.
====================================================================================================================================
The belt conveyor transporting bagasse-ashes at PG Gempolkrep is used to conveying bagasse-ashes from the boiler station to the bagasse warehouse. The belt conveyor simplifies and shortens work duration. However, PG Gempolkrep is an old sugar factory, the equipment is also aged and it makes the performance decreases. This book is about redesigning the belt and roller idler that purpoused to get the required motor power and calculations on the chain and sprocket. This redesigning is started with study of literature and field observation at PG Gempolkrep Mojokerto. After that, we get the data from observation and redesigning. Then we do the calculation and get the conclusion. The result is the belt conveyor requires 7.36 kW or 9.86 hp motor power. From the result, belt conveyor allowed to use electric motor with the power 10 hp. The belt length is 49,57 m and the chain numbered 100, the chain has a speed of 0.490 m/s with a length of 2131.98 mm is needed to make the belt conveyor move.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Belt conveyor, motor penggerak, rantai, sproket. |
| Subjects: | T Technology > TJ Mechanical engineering and machinery T Technology > TJ Mechanical engineering and machinery > TJ1398 Conveyors |
| Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
| Depositing User: | Ramadhani Gita Fitri |
| Date Deposited: | 13 Aug 2026 04:24 |
| Last Modified: | 13 Aug 2026 04:24 |
| URI: | http://repository.its.ac.id/id/eprint/68771 |
Actions (login required)
![]() |
View Item |