Evaluasi Performa Pompa Pada Instalasi Flushing Modul Chlorin Di PLTGU PT PJB Unit Pembangkitan Gresik

Andriani, Asafarid (2019) Evaluasi Performa Pompa Pada Instalasi Flushing Modul Chlorin Di PLTGU PT PJB Unit Pembangkitan Gresik. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10211600000073_Undergraduate_Thesis.pdf] Text
10211600000073_Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

PT PJB Unit Pembangkitan Gresik merupakan perusahaan yang selalu dituntut untuk siap memproduksi listrik dalam keadaan apa pun dengan sistem yang efisien. Berbagai upaya telah dilakukan, salah satunya melalui redesign sistem. Pada tugas akhir ini, kami mengangkat tema Evaluasi Performa Pompa pada Instalasi Flushing Modul Chlorin di PLTGU PT PJB Unit Pembangkitan Gresik dengan lokasi suction reservoir baru pada tangki RO (Reverse Osmosis) yang memproduksi air bersih. Pada tugas akhir ini dilakukan redesign instalasi baru dengan kapasitas sebesar 11 m³/jam yang telah diketahui berdasarkan data. Selanjutnya, dilakukan perhitungan head dan daya pompa yang dibutuhkan untuk perancangan serta evaluasi terhadap pompa yang ada untuk mengetahui apakah pompa tersebut dapat digunakan pada instalasi baru. Berdasarkan hasil perhitungan, diperoleh Heff sebesar 15,295 m, daya pompa sebesar 1,1 kW, efisiensi sebesar 51%, dan NPSHA sebesar 8,919 m. Berdasarkan hasil perhitungan tersebut, pompa yang telah tersedia, yaitu LOWARA CENTRIFUGAL PUMP CEA210/3, memenuhi persyaratan dan dapat digunakan untuk proses instalasi tersebut.
=====================================================================================================================================
PT PJB Gresik Generation Unit is a company that is always required to be ready to produce electricity under any circumstances and with an efficient system. Many things have been done, one of which is the redesign of the system. In this final assignment we are interested in bringing up the theme of Evaluation of Pump Performance in Chlorin Module Flushing Installation at PT PJB Steam Power Plant Gresik Unit with a new suction reservoir location, namely at the RO (Reserve Osmosis) tank that produces clean water.
In this final project, a new installation redesign with a capacity of 11 m3 / hour is known from the data, the head calculation and pump power needed to design and evaluate the existing pump can be used for the installation or not.
In the calculation, Heff is 15,295 m, pump power is 1.1 kW, efficiency is 51%, and NPSHA is 8.919 m and from the calculation the existing pump is LOWARA CENTRIFUGAL PUMP CEA210 / 3 meets or can be used for the installation process.

Item Type: Thesis (Diploma)
Additional Information: RSMI 621.64 And e-1 2019
Uncontrolled Keywords: Flushing module chlorin, capacity, power, Centrifugal pumps
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ903 Pumping machinery.
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21401-(D3) Diploma 3
Depositing User: Andriani Asafarid
Date Deposited: 13 Aug 2026 03:55
Last Modified: 13 Aug 2026 03:55
URI: http://repository.its.ac.id/id/eprint/69538

Actions (login required)

View Item View Item