Evaluasi Keandalan Pada Sistem 150 Kv Di Wilayah Jawa Timur Dengan Menggunakan Metoda Cumulant

Budiman, Frans (2016) Evaluasi Keandalan Pada Sistem 150 Kv Di Wilayah Jawa Timur Dengan Menggunakan Metoda Cumulant. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2214105048-undergraduate-theses.pdf]
Preview
Text
2214105048-undergraduate-theses.pdf - Published Version

Download (4MB) | Preview
[thumbnail of 2214105048-paperpdf.pdf]
Preview
Text
2214105048-paperpdf.pdf

Download (485kB) | Preview
[thumbnail of 2214105048-paperpdf.pdf]
Preview
Text
2214105048-paperpdf.pdf - Published Version

Download (485kB) | Preview

Abstract

Setiap unit pembangkit disebuah sistem tenaga listrik berfungsi
untuk menyediakan listrik agar permintaan beban dapat terlayani. Setiap
waktu unit pembangkit dapat mengalami gangguan sehingga tidak dapat
beroperasi. Jika gangguan terjadi secara bersamaan pada unit pembangkit
yang besar, maka terdapat kemungkinan daya tersedia dalam sistem
tenaga listrik berkurang sedemikian besar sehingga sistem tidak mampu
melayani beban. Perubahan beban sepanjang waktu dan cadangan daya
yang tersedia akan mengakibatkan forced outage, kondisi ini karena
terjadi beban puncak.
Pada tugas akhir ini akan dibahas mengenai keandalan sistem 150
kV di Wilayah Jawa Timur dengan menggunakan metode cumulant untuk
mengetahui nilai prediksi LOLP (Loss Of Load Probability). Metode
Cumulant adalah metode yang menghimpun akumulasi dari kombinasi
beberapa unit pembangkit dalam mensuplai kebutuhan beban yang
fluktuaktif. Dari hasil simulasi menggunakan excel diperoleh bahwa nilai
prediksi LOLP dari sistem 150 kV di Wilayah Jawa Timur adalah
0,734551753 hari/tahun. Nilai prediksi ini masih belum memenuhi
standar internasional 0,25 hari/tahun, tetapi sudah memenuhi standar PLN
yaitu 1 hari/tahun untuk Wilayah Jawa-Bali.
=======================================================================
Each generating unit in electrical power system is function to
provide electricity, in order to the load demand can be served. Every
time generating unit can be impaired, so that it cannot operate. If
interference occurs simultaneously on large generating units, then there
is a possibility of power available in the power system reduced, so great
that the system is not able to serve the load. Load change over time and
backup power available would result in a forced outage, the condition is
due to the peak load.
In this final project will be discussed regarding the reliability of
150 kV system in East Java, by using cumulant method to determine the
predictive value LOLP (Loss of Load Probability). Cumulant method is
a method that collect the accumulation of a combination several
generating units to supply the needs of load fluctuate. From the
simulation results obtained that using excel LOLP the predictive value
of 150 kV system in East Java is 0.734551753 days / year. The
predictive value still does not meet international standards of 0.25 days /
year, and it’s already meet the standards i.e. PLN 1 day / year for the
Java-Bali region.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.379 Bud e
Uncontrolled Keywords: Forced Outage, Loss Of Load Probability, dan Metode Cumulant
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 07 Oct 2019 02:07
Last Modified: 07 Oct 2019 02:07
URI: http://repository.its.ac.id/id/eprint/71009

Actions (login required)

View Item View Item