Perencanaan Metode Konstruksi Pekerjaan Basement Pada Proyek Apartement One East Residence Surabaya

Rahmadini, Hilda (2015) Perencanaan Metode Konstruksi Pekerjaan Basement Pada Proyek Apartement One East Residence Surabaya. Undergraduate thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 3113105024-Undegraduate Thesis.pdf]
Preview
Text
3113105024-Undegraduate Thesis.pdf - Published Version

Download (4MB) | Preview

Abstract

Basement merupakan ruang yang berada dibawah tanah yang
merupakan bagian dari gedung. Basement dapat berfungsi sebagai
ruang parkir pada gedung. Basement merupakan alternatif yang
dapat digunakan untuk mengatasi kekurangan ketersediaan lahan
saat ini.
Tugas akhir ini bertujuan untuk melakukan perencanaan
metode konstruksi pekerjaan basement pada Proyek Apartemen
One East Residence Surabaya. Metode konstruksi yang digunakan
adalah metode bottom up. Perencanaan metode konstruksi akan
dilakukan dengan menggunakan 2 skenario. Perbedaan antara 2
skenario tersebut terletak pada zonasi pekerjaan dan penggunaan
alat berat. Untuk masing-masing skenario dilakukan perhitungan
terhadap biaya dan waktu pelaksanaannya.
Dari perhitungan biaya dan waktu didapatkan hasil, skenario
pertama membutuhkan waktu pelaksanaan selama 497 hari
dengan biaya sebesar Rp 66.768.178.970,00 dan skenario kedua
membutuhkan waktu pelaksanaan 386 hari dengan biaya sebesar
Rp 90.964.651.850,00 Sedangkan pada kondisi existing
membutuhkan waktu pelaksanaan selama 633 hari dengan biaya
sebesar Rp 52.641.543.532,183.
==================================================================================================
Basement is a space located under the ground which is part of
building. Basement can serve as a parking lot in the building.
Basement is an alternative that can be used to overcome the
current lack of site space availability.
The purpose of this project is to make basement construction
method planning at One East Residence Surabaya Apartement
Project. Construction method that be used in this project is bottom
up method. Construction method planning will be carried out with
two scenarios. The differerent between two scenarios lies in the
zoning work and the use of heavy equipment. For each scenario
calculating cost and time project.
From the cost and time calculation result, the first scenario
takes 497 days with Rp 66.768.178.970,00 and the second scenario
takes 386 days with Rp 90.964.651.850,00. While the existing
conditions requires 633 days with Rp 52.641.543.532.183

Item Type: Thesis (Undergraduate)
Additional Information: RSS 690.831 4 Rah p
Uncontrolled Keywords: basement, bottom-up, metode konstruksi
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD1391 Apartment houses
T Technology > TH Building construction
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 07 Oct 2019 04:29
Last Modified: 07 Oct 2019 04:29
URI: http://repository.its.ac.id/id/eprint/71025

Actions (login required)

View Item View Item