Pembuatan Model Dan Analisis Kinerja Proses Pengadaan Spareparts PT XYZ Menggunakan Algoritma Heuristic Miner

Margareta, Rican (2015) Pembuatan Model Dan Analisis Kinerja Proses Pengadaan Spareparts PT XYZ Menggunakan Algoritma Heuristic Miner. Undergraduate thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 5211100030-Undergraduate Thesis.pdf]
Preview
Text
5211100030-Undergraduate Thesis.pdf - Published Version

Download (3MB) | Preview

Abstract

Dewasa ini banyak perusahaan telah menerapkan sistem Enterprise Resource Planning (ERP) untuk memenuhi segala kebutuhan proses bisnisnya. PT XYZ yang merupakan salah satu perusahaan dengan hasil produksi semen terbesar di Indonesia juga menerapkan ERP dengan menggunakan perangkat lunak SAP. Salah satu proses bisnis yang utama untuk menunjang segala aktivitas produksi adalah pengadaan spareparts. Dalam melakukan pengadaan spareparts, perusahaan telah mendefinisikan proses bisnis pengadaan. Akan tetapi pada proses yang dijalankan oleh perusahaan seringkali tidak sesuai dengan pengadaan yang telah direncanakan seperti adanya ketidaktepatan waktu pengiriman dan juga terdapat bottleneck terhadap aktivitas pengadaan spareparts dari vendor. Sehingga diperlukan suatu pemodelan untuk memodelkan proses bisnis yang selama ini berjalan di perusahaan.
Pemodelan dilakukan dengan teknik penggalian proses berdasarkan catatan kejadian yang terdapat pada modul MM PT XYZ. Teknik penggalian proses dilakukan dengan menggunakan algoritma Heuristic Miner dengan menggunakan perangkat lunak ProM dan menggunakan perspektif control-flow yang menghasilkan model bentuk Petri Net yang selanjutnya akan dianalisis sesuai dengan teknik penggalian proses yang akan dilakukan sehingga dapat memberikan evaluasi mengenai proses pengadaan spareparts
vii
yang dijalankan serta dapat digunakan untuk mengidentifikasi adanya peluang peningkatan proses oleh PT XYZ.
Setelah dilakukan pemodelan dan analisisi dihasilkan analisis bottleneck, bottleneck terjadi dari aktivitas PR disetujui menuju ke pembuatan RFQ dan dari pembuatan PO dibuat menuju ke penerimaan spareparts dikarenakan adanya kelengkapan dokumen yang harus diselesaikan terlebih dahulu. Analisis ketepatan waktu kedatangan material didapatkan rata-rata kedatangan waktu material tidak melebihi batas waktu yang ditentukan perusahaan, akan tetapi tidak sedikit yang mengalami keterlambatan pengiriman seperti material bearing, bolt, module, motor ac, pulley dan shaft. Selain itu berdasarkan hasil analisis ketepatan waktu kedatangan material juga didapatkan vendor yang melakukan keterlambatan terbanyak yaitu vendor dengan nomor 210002.
======================================================================================================
Today many companies have implemented Enterprise Resource Planning system (ERP) to fulfill all the needs of its business processes. XYZ which is one of the largest cement production in Indonesia is also implementing ERP using SAP software. One of the main business processes to support all the activities of production is the procurement of spare parts. In conducting the procurement of spare parts, the company has defined the business process of procurement. But the processes run by companies are often not in accordance with the planned procurement as their inaccuracy delivery time and also there is a bottleneck for the procurement of spare parts from a vendor activity. So, we need a model to model business processes that have been running in the company.
Modeling is done with process mining based on event log contained in the MM module PT XYZ. Process mining is performed by using a heuristic algorithm Miner by using the software PROM and use control-flow perspective that generates a model form of Petri Net which will then be analyzed according to the technique of excavation process will be carried out so as to provide an evaluation of the procurement process run as well as spare parts can be is used to identify process improvement opportunities by XYZ.
After modeling and analysis generated analisisi bottleneck, the bottleneck occurs approved PR activities leading to the manufacture
ix
of manufacture PO RFQ and made toward the acceptance of spare parts due to the documents that must be completed first. Analysis timeliness of arrival of materials obtained an average arrival time of the material does not exceed the specified time limit the company, but not least the delayed delivery of such a material bearing, bolt, module, ac motors, pulleys and shafts. Also based on the results of the analysis of the timeliness of arrival of materials also obtained a vendor that does most delays are vendors with number 210002.

Item Type: Thesis (Undergraduate)
Additional Information: RSSI 005.1 Mar p
Uncontrolled Keywords: SAP, Penggalian Proses, Petri Net, ProM, Heuristic Miner, Bottleneck.
Subjects: Q Science > QA Mathematics > QA76.9D338 Data integration
Q Science > QA Mathematics > QA9.58 Algorithms
Divisions: Faculty of Information Technology > Information System > 57201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 15 Oct 2019 03:52
Last Modified: 15 Oct 2019 03:52
URI: http://repository.its.ac.id/id/eprint/71183

Actions (login required)

View Item View Item