Perencanaan ulang embung Kelbung Kabupaten Bangkalan

Sumartono, Heri (2015) Perencanaan ulang embung Kelbung Kabupaten Bangkalan. Undergraduate thesis, Institut Teknology Sepuluh Nopember.

[img]
Preview
Text
3111100084-Undergraduate_Thesis.pdf

Download (9MB) | Preview

Abstract

Desa Kelbung adalah salah satu desa di kabupaten Bangkalan. desa kelbung dihuni oleh pengungsi konflik sampit yang berasal dari Kota Sambas, Kalimantan Barat. Lokasi desa ini berjarak 30 km dari ibu kota Kecamatan Sepulu. Desa kelbung dihuni oleh 130 KK. Pada tahun 2002 mereka membangun sebuah embung untuk kebutuhan air bersih mereka. Embung ini dibangun secara swadaya dan LSM. Namun saat ini embung telah mengalami beberapa kerusakan. Pada Tugas Akhir ini akan melakukan perencanaan ulang Embung Kelbung. Pada Tugas Akhir ini akan melakukan analisis hidrologi, analisis kapasitas tampungan, analisa hidrolika, dan analisis kestabilan. Hasil analisis perencanaan Embung Kelbung antara lain adalah debit banjir rencana yang didapatkan dengan menggunakan metode Hidroraf Nakayasu adalah 3.60 m3/dt., kebutuhan air baku penduduk di tahun 2040 atau tahun rencana adalah 156 m3/hari dan kapasitas kebutuhan tampungan sebesar 36207 m3 dan berada pada elevasi +136.10 m. Konstruksi bendungan sendiri yaitu memiliki panjang 100 m dengan tinggi 9.05 m dengan kemiringan hulu dan hilir sebesar 1 : 2. Dengan kemiringan tersebut didapatkan nilai Safety Factor (SF) 2.00 atau lebih besar daripada SF minimal yaitu 1.2 (normal) dan 1.5 (gempa). Sehingga perencanaan tersebut dapat memenuhi persyaratan keselamatan bendungan. ================================================================================================== Kelbung village is one of the villages in Bangkalan. kelbung village inhabited by refugees Sampit Conflict from the Sambas City, West Kalimantan. The location of this village is 30 km far away from the capital of the District Sepulu. Kelbung village inhabited by 130 families. In 2002 they built a dam or “Embung” for their water needs. These “embung” are built independently and NGOs. But this time “embung” has suffered some damage. In this final project will perform re-planning Embung Kelbung. In this final project will conduct hydrological analysis, analysis of storage capacity, hydraulics analysis, and analysis of stability. Kelbung Embung planning analysis results include flood discharge plan obtained using methods Hidroraf Nakayasu is 3.60 m3 / sec., The raw water needs of the population in 2040 or the plan is 156 m3 / day and the capacity of the storage requirement of 36 207 m3 and are at +136.10 m elevation. Construction of the dam has a length of 100 m with a height of 9:05 meters with upstream and downstream slope of 1: 2. With the slope values obtained Safety Factor (SF) 2:00 or greater than the minimum SF is 1.2 (normal) and 1.5 (earthquake). So that the plan can meet the safety requirements of the dam.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 627.86 Sum p
Uncontrolled Keywords: desa kelbung; embung kelbung; air baku; dimensi embung; safety factor
Subjects: G Geography. Anthropology. Recreation > GB Physical geography > GB1197.7 Groundwater flow. Reservoirs
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - Taufiq Rahmanu
Date Deposited: 23 Oct 2019 06:17
Last Modified: 23 Oct 2019 06:17
URI: http://repository.its.ac.id/id/eprint/71358

Actions (login required)

View Item View Item