Perencanaan Jalur Ganda (Double Track) Lintas Purwokerto – Kroya

Purwandana, Muhamad Rizki (2015) Perencanaan Jalur Ganda (Double Track) Lintas Purwokerto – Kroya. Undergraduate thesis, Institut Teknology Sepuluh Nopember.

[img]
Preview
Text
3111100144-UndergraduateThesis.pdf - Published Version

Download (9MB) | Preview

Abstract

Dalam Tugas Akhir ini, direncanakan penambahan jalur kereta api baru untuk lintas Purwokerto – Kroya guna mengatasi padatnya lalu lintas kereta api di jalur selatan akibat banyaknya permintaan masyarakat akan transportasi yang aman dan nyaman, serta mengurangi jumlah kendaraan yang melewati lintas selatan pulau Jawa khususnya di kota Purwokerto. Dalam prosesnya, metodologi yang digunakan adalah pengumpulan data-data sekunder dan primer, identifikasi permasalahan, studi pustaka dan analisa data perencanaan. Hasil dari tugas akhir ini adalah jalan rel baru yang mengacu pada trase eksisting sejauh 27 km, untuk STA 350+000 – STA 350+800, STA 357+200 – STA 361+300, dan STA 362+200 – STA 363+600 diletakkan di sisi kanan rel lama. Sedangkan untuk STA 350+800 – STA 357 + 200, STA 361+300 – STA 362 +200, dan STA 363+600 – STA 377+122 diletakkan di sisi kiri rel lama. Dari hasil perhitungan struktur badan jalan rel didapatkan, rel yang digunakan adalah tipe R 54 dengan lebar sepur 1067 mm dan total anggaran biaya yang diperlukan untuk pembangunan jalur ganda ini senilai Rp 679.652.140.000,00. ======================================================================================================== Within this final project, additional rails to train track lane across Purwokerto – Kroya is planned in order to overcome Kroya Purwokerto – density of railway traffic in the South line due to the large number of requests of the community will be a safe and convenient transportation, as well as reduce the number of vehicles that pass through traffic South of Java, especially in Purwokerto. In the process, the methodology used is the collection of secondary and primary data, problem identification, literature study, and planning data analysis. The results of this final project is a new track which refers to the existing alignment as far as 27 km, for STA 350+000 – STA 350+800, STA 357+200 – STA 361+300, dan STA 362+200 – STA 363+600 is positioned to the right of the existing rails. Whilst for STA 350+800 – STA 357 + 200, STA 361+300 – STA 362 +200, dan STA 363+600 – STA 377+122 it is positioned to the left of the existing rails. From the results of the structural calculations of the rails body it is obtained that, the rails used is type R 54 with the width of 1067 mm and total budget needed to build this new track as much as Rp 679.652.140.000,00.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 625.14 Pur p
Uncontrolled Keywords: Jalur rel Purwokerto - Kroya, kereta api, jalur ganda.
Subjects: T Technology > TF Railroad engineering and operation
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 24 Oct 2019 03:01
Last Modified: 24 Oct 2019 03:01
URI: http://repository.its.ac.id/id/eprint/71382

Actions (login required)

View Item View Item