Uji Coba Implementasi Waktu Standar Dalam Pengelolaan Aktivitas Satgas Pertamanan Dkp Surabaya

Zakiyyah, Nuriy Zulfah (2016) Uji Coba Implementasi Waktu Standar Dalam Pengelolaan Aktivitas Satgas Pertamanan Dkp Surabaya. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2512100062-undergraduate-theses.pdf]
Preview
Text
2512100062-undergraduate-theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Surabaya merupakan kota dengan penduduk terbesar nomor dua di Negara
Indonesia, dan jumlahnya diperkirakan akan terus meningkat setiap tahunnya.
Peningkatan jumlah penduduk tentunya diiringi dengan peningkatan jumlah
kebutuhan oksigen, yang kemudian menuntut jumlah taman. Peningkatan jumlah
taman berimbas pada peningkatan jumlah satgas yang harus dipekerjakan DKP
Kota Surabaya selaku pengelola taman Kota Surabaya, dan peningkatan
kebutuhan satgas akan berdampak pada pengeluaran DKP Kota Surabaya. Agar
pengeluaran DKP Kota Surabaya dapat efektif, maka perlu dilakukan
pengoptimalan kinerja satgas. Pada tahun 2015, telah dilakukan penelitian oleh
Kamil (2015) dan Rydley (2015) mengenai waktu standar sebagai dasar untuk
mengoptimalkan kinerja satgas, namun belum ada mekanisme penerapan waktu
standar serta pemberian tugas kepada satgas pertamanan melalui sebuah sistem
yang baku. Penelitian ini bertujuan untuk membuat sistem dapat membantu
penerapan waktu standar. Proses penelitian dimulai dengan pengumpulan data
kondisi terkini, kemudian perandangan dan pengimplementasian sistem. Hasil
implementasi kemudian dianalisa untuk membuat perbaikan sistem. Sistem yang
dibuat merupakan terdiri atas sistem informasi dan SOP penerapan. Input untuk
sistem informasi adalah data penugasan yang terdiri atas data instruksi, kode area
instruksi, persentase area instruksi serta nama satgas yang diberi instruksi
sedangkan outputnya adalah penugasan satgas dan rekap tugas. Penugasan satgas
yang akan diketahui berupa rekap tugas satgas yaitu data instruksi, luas area
instruksi, serta estimasi waktu pengerjaan, sementara rekap tugas yang diketahui
vi
terdiri atas data instruksi, kode area dan luas area. Melalui penelitian ini, diketahui
bahwa pembuatan sistem membutuhkan data lain selain waktu standar antara lain
data pembagian area dan luasnya pada setiap taman serta daftar aktivitas pada
taman tersebut. Beberapa hal yang penting untuk diperhatikan dalam pelaksanaan
sistem adalah pemberian penugasan yang jelas dari koordinator, partisipasi dari
satgas, koordinator serta Kepala UPTD Taman Flora, serta pembaruan sistem bila
ada perubahan.
===============================================
Surabaya is the second city with largest population in Indonesia and still
predicted to growth annually. The population growth leads to increase of oxygen
needed. One of the ways to fulfill the oxygen needs is by creating some parks
however, creating more parks will cause more expenditure for DKP Kota
Surabaya. In order to not waste the expenditure, DKP Kota Surabaya needs to
optimize the performance of their park worker. In 2015, some researches has been
conducted by Kamil (2015) and Rydley (2015) to discover standard time for
activity of park’s worker to optimize their performance, however, due to no
mechanism and standard for duty provision, the standard time has not been used.
This research is conducted to create a system to implement the standard time. The
research is started with data collection of current condition then continued with
system design and implementation. The implementation’s results then being
analyzed to create improvement to the system. System that made consists of
information system and SOP. Input for the information system is assignment data
which consists of instruction data, area code data, area percentage data and name
of park worker that given the instruction, while the outputs are park worker
assignment and recap of assignment. The park worker assignment that can be
known through the system consists of instruction data, wide of instruction area,
and working time estimation while recap of assignment consists of instruction
data, area code and wide. Based on this research, there are other data that needed
to build the system beside standard time, they are area partition and wide for
every park, and list of activity on every park. Several importance things that
needed to be noted are clear duty distribution from coordinator, participation from
viii
park’s worker, coordinator and head of UPTD Taman Flora, and also system
update if there is an important change.

Item Type: Thesis (Undergraduate)
Additional Information: RSI 658.542 1 Zak u-1
Uncontrolled Keywords: DKP Kota Surabaya, Satgas Pertamanan, Sistem, Work Sampling
Subjects: T Technology > TD Environmental technology. Sanitary engineering > TD194.6 Environmental impact analysis
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 25 Oct 2019 09:59
Last Modified: 25 Oct 2019 09:59
URI: http://repository.its.ac.id/id/eprint/71427

Actions (login required)

View Item View Item