Analisis kriteria dan pemilihan basis tempat Aplikasi aljabar max-plus pada penjadwalan flowshop dengan menggunakan timed petri net

Yanuarsih, Susi (2015) Analisis kriteria dan pemilihan basis tempat Aplikasi aljabar max-plus pada penjadwalan flowshop dengan menggunakan timed petri net. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
1211100096-Undergraduate_Thesis.pdf

Download (1MB) | Preview

Abstract

Aljabar Max-Plus merupakan salah satu teknik analisis pengkajian dari sistem event diskret yang mempunyai banyak aplikasi pada teori sistem, Petri net dan teori graph. Salah satu aplikasinya adalah pada penjadwalan sistem produksi. Pada penelitian ini, didesain penjadwalan sistem produksi flowshop. Di dalam penelitian ini dibahas masalah penjadwalan 5 workstation dan 3 job. Dari data yang ada dibuat sinkronisasi antar mesin. Dari sinkronisasi tersebut dicari permutasi urutan job yang optimal, dengan menggunakan algoritma Branch dan Bound dengan pendekatan Aljabar Max-Plus. Selanjutnya, dikonstruksi model petri net dan Aljabar Max-Plus untuk menentukan jadwal pemrosesan job di masing - masing mesin. Berdasarkan studi kasus di UKM Rizki Makmur, didapat model dinamik X(k) = M ⊗ X(k − 1), serta urutan job yang mengoptimalkan makespan (jangka waktu selesainya seluruh job) yang dihasilkan adalah job 2 (pembuatan kusen), job 3 (pembuatan jendela), job 1 (pembuatan pintu) dengan makespan sebesar 170 menit. =================================================================================================== Max-plus Algebra is one of the engineering assessment analysis of discrete event systems which have many applications on systems theory, Petri net and graph theory. One of its application is production scheduling system. In this research, flowshop production scheduling system is designed. In this research scheduling issues of 5 workstation and 3 job is discussed. From the existing data, synchronization between machines created. From the synchronization will be sought permutation of optimal job sequence, using Branch and Bound Algorithm with Max-Plus Algebra approach. Furthermore, the model is constructed petri net and Max-Plus algebra to determine the schedule of job processing in each machine. Based on case studies in UKM Rizki Makmur, obtained the dynamic model X(k) = M ⊗ X(k − 1), we can get the job sequence that optimizes makespan (term of completion of the entire job), the sequence generated job is a job 2 (manufacture frames), job 3 (manufacture of windows), job 1 (manufacture of doors) with makespan of 170 minutes.

Item Type: Thesis (Undergraduate)
Additional Information: RSMa 512 Yan a
Uncontrolled Keywords: Aljabar Max-Plus, Timed Petri Net, Penjadwalan Flowshop
Subjects: Q Science > QA Mathematics > QA184 Algebra, Linear
Divisions: Faculty of Mathematics and Science > Mathematics > 44201-(S1) Undergraduate Thesis