Rumah Sakit Umum PHC Klas C di Banjarmasin

Zulkarnaen, Guruh Pratama (2016) Rumah Sakit Umum PHC Klas C di Banjarmasin. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3215111002-master-theses.pdf - Published Version

Download (4MB) | Preview

Abstract

Sejalan dengan pengembangan Bisnis Pelindo III yang pesat maka sarana dan prasarana fisik juga dikembangkan secara pesat termasuk fasilitas kesehatannya. Seperti halnya perkembangan PT. Pelindo III sebagai pemilik, maka RS PHC Surabaya juga berkembang dengan pesat. Peningkatan kualitas layanan, penambahan kapasitas serta penambahan fasilitas pelayanan makin memperkuat posisi RS PHC sebagai RS Pelabuhan yang andal, yang bahkan kini menjadi anchor untuk RS di wilayah Surabaya Utara. Melihat kondisi di atas serta adanya perkembangan pada wilayah-wilayah operasional Pelindo III lainnya maka pengembangan fasilitas kesehatan berupa RS pelabuhan dipandang menjadi bagian yang tidak terpisahkan. Sebagai langkah awal, wilayah operasional yang akan dikembangkan fasilitas RS pelabuhannya adalah area kerja Banjarmasin. Pada dasarnya fasilitas ini menjadi satu jejaring dengan RS PHC Surabaya sebagai induknya. Pembangunan RS PHC Banjarmasin menjadi bagian dari peningkatan mutu pelayanan dan pemerataan pelayanan kesehatan di Kota Banjarmasin. Pembangunan Rumah Sakit tersebut dilaksanakan pada lahan kosong milik Pelindo III dan diharapkan dapat meningkatkan nilai kawasan, karena berada dekat area pusat pemerintahan kota, Pembangunan RS PHC Banjarmasin harus mempertimbangkan konsep jejaring dengan RS PHC induk yang berada di Surabaya tanpa meninggalkan elemen lokalitas setempat. RS PHC Banjarmasin mengikuti Prasyarat Arsitektur dan Lingkungan dengan menjamin terwujudnya bangunan gedung berdasar karakteristik lingkungan dan budaya daerah sehingga seimbang serasi dan selaras dengan lingkungannya, menjamin terwujudnya tata ruang hijau yang dapat memberikan keseimbangan dan keserasian bangunan terhadap lingkungannya dan menjamin bangunan gedung dibangun dan dimanfaatkan dengan tidak menimbulkan dampak negatif terhadap lingkungan. RS PHC Banjarmasin juga mengikuti Kriteria Khusus yang mana dikaitkan dengan upaya pelestarian lingkungan dan konservasi energi dan kesatuan perencanaan bangunan dengan lingkungan yang ada disekitarnya. ========================================================== In line with the business development of Pelindo III rapid the physical infrastructure also developed rapidly, including their health facilities. As well as the development of PT. Pelindo III as the owner, then the Pelindo Health Care (PHC) Hospital Surabaya is also growing rapidly. Improved quality of service, increase capacity as well as additional service facilities further strengthens the position of the Port Hospital RS PHC as a reliable, which even now the anchor for the Hospital in the region of North Surabaya. Seeing the above conditions as well as the developments in the operational areas, the development of Pelindo III other health facilities such as hospitals port is seen to be an integral part. As a first step, the operational area which will be developed hospital facilities Banjarmasin port is the work area. Basically these facilities into one network with Pelindo Health Care (PHC) Hospital Surabaya as its main of part. Cconstruction of Pelindo Health Care (PHC) Hospital Banjarmasin be part of improving quality of care and equity of health services in the city of Banjarmasin. Hospital construction was held on vacant land belonging to Pelindo III and is expected to increase the value of the area, because it is located near the central area of the city administration, the construction of Pelindo Health Care (PHC) Hospital Banjarmasin should consider the concept of networking with main of part PHC Hospital is in Surabaya without leaving the local locality element. Pelindo Health Care (PHC) Hospital Banjarmasin follow Prerequisites Architecture and Environment to ensure the realization of buildings based on environmental characteristics and culture of the area so balanced and in harmony with the environment, ensuring the realization of green space that can provide the balance and harmony of the building on the environment and ensure the building is built and utilized with no a negative impact on the environment. Pelindo Health Care (PHC) Hospital Banjarmasin also follow Special Criteria which is associated with effort to the preservation of the environment and energy conservation and building planning unity with the environment around it.

Item Type: Thesis (Undergraduate)
Additional Information: RPA 725.51 Zul r
Uncontrolled Keywords: Green Architecture, Rumah Sakit, Umum Klas C, Banjarmasin
Subjects: N Fine Arts > NA Architecture > NA9051 Residential areas. Site planning
Divisions: Faculty of Civil Engineering and Planning > Architechture > 23201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 21 Nov 2019 06:32
Last Modified: 21 Nov 2019 06:32
URI: http://repository.its.ac.id/id/eprint/71943

Actions (login required)

View Item View Item