Integrated Work Breakdown Structure for Shipbuilding On Department Group Machinery Part Zone Block Engine Room

Akbar, Pratama (2019) Integrated Work Breakdown Structure for Shipbuilding On Department Group Machinery Part Zone Block Engine Room. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211750027003-Master_Thesis.pdf] Text
04211750027003-Master_Thesis.pdf
Restricted to Repository staff only

Download (21MB) | Request a copy

Abstract

In the Work Breakdown Structure for Ship Building of Machinery Outfitting is related in to four parts of the Main Bureau Group. The four parts of them were Machinery, Ducting, HVAC & Piping, Steel Work and Insulation. Integrated Work Breakdown Structure is one of shipbuilding methods involving several system tools that are in a management, so that design time is becoming obtained shorter. The Ducting, HVAC & Piping is the System Based on the Basic Design Drawing, Key Plan after the Contract Assignment and Drawing Approval By Classification Society from fabrication, Installation until Outfitting Manufacturing. After that, we compare positive effect and negative side of each Cost and Time Estimation. Which one visible, continue with combine Product Structure and Project Structure. Problem start from how do we compare old technology WBS with new WBS technology. There is no optimization process of the ship building process. There is no working breakdown structure of the supporting concepts for the outfitting in the engine room. Bar Chart, Combination of Industrial and Financial System with Design Software also Program Project Evaluation and Review Technique Methodology will be used for this case. Results obtained in the form of a work breakdown structure for a Production Guidelines. The Aim of this Thesis was for Optimization Process for Ship Building Time. The schedule created compared with the actual schedule that occurs so that we can see progress, there is a difference of time which shows that the shipyard has apply the integration. This also will lead to man-hour optimization. Therefore, it is concluded that integrated work breakdown structure can be applied to obtain the shipyard design in a shorter time, so it can be used as a recommendation to the shipyard in the ship design process that was more efficient.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Engine Room Zone, Integrated Work Breakdown Structure, Ship Building
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > TS Manufactures > TS155 Production control. Production planning. Production management
T Technology > TS Manufactures > TS157.5 Production scheduling
T Technology > TS Manufactures > TS176 Manufacturing engineering. Process engineering (Including manufacturing planning, production planning)
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM297 Ships Designs and drawings
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM298.5 Shipbuilding industri. Shipyards
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36101-(S2) Master Theses
Depositing User: Pratama Akbar
Date Deposited: 23 Jul 2026 06:59
Last Modified: 23 Jul 2026 06:59
URI: http://repository.its.ac.id/id/eprint/72113

Actions (login required)

View Item View Item