Sariningsih, Ika Desita (2015) Analisa Tegangan Riser Clamp Ula Platform Milik PHE-ONWJ (Pertamina Hulu Energi – Offshore North West Java). Undergraduate thesis, Institut Teknology Sepuluh Nopember.
Preview |
Text
4311100006-Undergraduate Thesis.pdf - Published Version Download (3MB) | Preview |
Abstract
ULA platform merupakan struktur jacket baru yang kan dioperasian di laut jawa tepatnya pada barat laut. Struktur ini didesain untuk mencapai produksi minyak sebesar 2200 BOPD dan gas 10 MMSCFD. Untuk menunjang produksi tersebut, maka membutuhkan fasilitas produksi seperti riser. Dalam desain riser hal yang perlu diperhatikan adalah riser clamp. Riser clamp merupakan salah satu bagian yang vital dalam struktur jacket. Riser clamp adalah sutau alat yang digunakan dalam penyambungan riser dengan struktur. Kekuatan riser clamp sangat berpengaruh ketika struktur beroperasi. Tegangan yang diperoleh riser clamp akan mempengaruhi kekuatan dari riser clamp dan juga brace yang menghubungkan riser clamp dengan struktur yang pada akhirnya mempengaruhi juga kekuatan brace pada struktur itu sendiri. Dalam tugas akhir ini akan dilakukan kajian mengenai analisa tegangan riser clamp pada ULA Platform menggunakan software Autopipe untuk mengetahui beban-beban yang terjadi pada riser clamp serta menggunakan software Ansys untuk mengetahui tegangan maksimumnya. Tegangan Von Misses maksimum yang terjadi pada Riser Clamp yaitu sebesar 628 MPa dengan SMYS 720 MPa maka nilai Unity Check (UC) yang terjadi sebesar 0,872. Sedangkan untuk bracing clampnya tegangan Von Misses maksimum yang terjadi yaitu sebesar 225 MPa maka maka nilai Unity Check (UC) yang terjadi sebesar 0,313. Nilai Unity Check (UC) yang terjadi pada riser clamp serta pada bracing clamp nilainya masih dibawah 1(satu), maka struktur clamp tersebut aman.
=======================================================================================================
ULA platform is a new jacket structure operated in the north-west of the Java sea. This structure is designed to achieve oil and gas production for 2200 BOPD and 10 MMSCFD . To support the production, it requires facilities such as the riser. One important thing in the design of riser is the riser clamp. Riser clamp is a vital part in jacket structure. Riser clamp is used to support riser system. Strength of riser clamp had influencing the structure. Stress of riser clamp will affect the strength of the riser clamp and the bracing clamp, especially for jacket brace. In this final project will be studied the riser clamp stress analysis on ULA platform with Autopipe software for global analyis and Ansys software to determine the maximum stress. The total maximum Von Misses stress at the Riser Clamp is 628 MPa with the material SMYS is 720 MPa , so Unity Check (UC) is 0.872. As for bracing clamp , maximum of Von Misses stress is 225 MPa with the material SMYS is 720 MPa, so the Unity Check (UC) is 0,313. The Value of Unity Check (UC) at the riser clamp and the bracing clamp are less than 1 (one), so the clamp structure is secure.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSKe 627.98 Sar a |
Uncontrolled Keywords: | ULA Platform, riser clamp, bracing clamp,Tegangan VonMisses, Unity Check |
Subjects: | T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures |
Divisions: | Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis |
Depositing User: | Mr. Tondo Indra Nyata |
Date Deposited: | 02 Dec 2019 02:20 |
Last Modified: | 02 Dec 2019 02:20 |
URI: | http://repository.its.ac.id/id/eprint/72129 |
Actions (login required)
View Item |