Perencanaan Jetty Untuk Kapal 12.000 Dwt Muatan Aspal Di Kabupaten Tuban

Hidayat, Taufik (2016) Perencanaan Jetty Untuk Kapal 12.000 Dwt Muatan Aspal Di Kabupaten Tuban. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[img]
Preview
Text
3113106039-undergraduate-theses-.pdf - Published Version

Download (5MB) | Preview

Abstract

Seiring dengan meningkatnya sarana transportasi di Indonesia, kebutuhan aspal sebagai material perkerasan jalan pun ikut meningkat. Kebutuhan permintaan aspal di Indonesia yang terus meningkat setiap tahunnya mencapai 1,2 juta ton dan akan terus meningkat dimasa mendatang. Sementara produksi aspal dalam negeri pertahunnya kurang lebih 400 ribu ton. Maka untuk memenuhi kebutuhan permintaan aspal dalam negeri, pemerintah mengimpor aspal langsung dari luar negeri. Meningkatnya permintaan kebutuhan aspal dalam negeri sebagian besar terjadi di pulau Jawa, khususnya wilayah bagian timur dan tengah pulau Jawa. Permintaan aspal yang cukup besar tidak diimbangi dengan kapasitas dermaga selaku tempat yang menyediakan layanan awal pendistribusian aspal. Oleh karena itu, pemerintah berencana menambah kapasitas dermaga yang diperuntukkan sebagai pendistribusian aspal. Perencanaan Jetty dibagi menjadi perencanaan layout perairan dan layout daratan. Hasil analisi perhitungan kebutuhan dari perencanaan jetty didapat enam Mooring Dolphin dengan dimensi 4m x 4m , dua Breasting Dolphin 6m x 6m, ii Unloading Platform 26m x 12m, Trastle 24m x 4m dan tiga jenis Catwalk 12m,14m,16m. Biaya yang diperlukan untuk pembangunan proyek Jetty Untuk Kapal 12.000 DWT Muatan Aspal Di Kabupaten Tuban sebesar Rp.29.225.000.000,00 (Dua puluh Sembilan milyar dua ratus dua puluh lima juta rupiah). Hasil yang telah dianalisa belum termasuk pekerjaan pengerukan. ============================================================ Along with the increase of transportation in Indonesia, asphalt as a road paving material increased, too. The demand of asphalt in Indonesia continues to increase each year to reach 1.2 million tons and will continue to increase in the future. While the production of asphalt in the country annually approximately 400 thousand tons. So, to meet the needs of the domestic demand for asphalt, bitumen is imported directly from abroad. The increasing demand for asphalt in this country occurs mostly on Java, particularly the region of eastern and central parts of Java. The big demand of asphalt is not matched by the capacity of the pier as a place that provides the initial services for distribution of asphalt. Therefore, the government plans to increase the capacity of the pier which is applied as asphalt distribution. Jetty plans are divided into water and land layout. The results of analysis of the planning requirement calculations are obtained : 6 Mooring Dolphins with dimensions of 4m x 4m, 2 breasting Dolphins 6m x 6m, Unloading Platform 26m x 12m, iv Trastle with dimension 24m x 4m and three types Catwalk 12m, 14m, 16m. The cost required for the construction of 12,000 DWT Jetty for asphalt cargo vessel in Tuban district is IDR.29.225.000.000,-(Twenty nine billion two hundred tewnty five million rupiahs). The calculation results are not contained the dredging works.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 627.31 Hid p
Uncontrolled Keywords: Jetty, Aspal, 12.000 DWT, Kabupaten Tuban.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC205 Harbors--Design and construction.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 02 Dec 2019 09:37
Last Modified: 02 Dec 2019 09:37
URI: http://repository.its.ac.id/id/eprint/72159