Perencanaan Gedung Park and Ride di Stasiun Bojong Gede Kecamatan Bojong Gede Kabupaten Bogor Jawa Barat

Farisi, Salman Al (2020) Perencanaan Gedung Park and Ride di Stasiun Bojong Gede Kecamatan Bojong Gede Kabupaten Bogor Jawa Barat. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111640000028-Undergraduate_Thesis.pdf]
Preview
Text
03111640000028-Undergraduate_Thesis.pdf

Download (2MB) | Preview

Abstract

Kabupaten Bogor adalah kabupaten yang merupakan dari megapolitan Jabodetabek dan menjadi kabupaten dengan jumlah 5,13 juta penduduk. Saat ini Kabupaten Bogor berkembang menjadi tempat tinggal kaum urban dan sentra industri. Bogor berkembang sangat cepat baik dari segi insfrastruktur kota maupun segi perekonomian. Seiring dengan berkembangnya perekonomian warga setempat, jumlah pemilik dan pengguna kendaraan pribadi di Kabupaten Bogor pun meningkat pesat. Hal ini menyebabkan terjadinya kemacetan karena tidak disertai dengan penambahan fasilitas penunjang transportasi. Kebutuhan akan modatransportasi kini sudah menjadi hal yang sangat penting bagi penduduk suatu kota. Karena transportasi merupakan sarana yang sangat penting dalam memperlancar roda perekonomian suatu wilayah. Untuk itu dibutuhkan sebuah solusi untuk mengurangi kemacetan dengan cara memaksimalkan manfaat dari transportasi umum seperti kereta Commuter Line.
Salah satu solusi yang dapat dilakukan adalah pembangunan gedung Park and Ride sebagai fasilitas penunjang transportasi pada Stasiun Bojong Gede, Kecamatan Bojong Gede, Kabupaten Bogor. Dalam perencanaan gedung park and ride diperlukan beberapa data pendukung untuk mempermudah pengerjaan Tugas Akhir ini yaitu data primer dan data sekunder. Data primer berupa data volume penumpang dan survey kuisioner penumpang. Data ini diperoleh dengan cara melakukan survey langsung di lokasi perencanaan pada pukul 06.00 – 08.00 WIB dimana merupakan pukul tersebut adalah waktu sibuk para pengguna commuter line untuk bekerja menuju Jakarta ataupun juga menugu Kota Bogor. Adapun data sekunder yang digunakan berupa data yang didapat dari instansi-instansi terkait serta berdasarkan studi literatur. Data-data tersebut kemudian diolah untuk merencanakan layout gedung Park and Ride.
Dari hasil pengolahan data tersebut menggunakan bantuan program aplikasi Microsoft Excel didapatkan jumlah demand calon pengguna fasilitas park and ride untuk sepeda motor sebesar 3.454 kendaraan, sedangkan untuk mobil pribadi sebesar 192 kendaraan dengan umur rencana hingga tahun 2024 (5 tahun). Dari jumlah demand tersebut direncanakan gedung park and ride yang dapat menampung 3.479 sepeda motor dan 193 mobil dengan jumlah lantai parkir 8 dan 1 lantai untuk akses menuju peron.
====================================================================================
Bogor Regency is a regency that is a part of the greater Jakarta Bogor Depok Tanggerang Bekasi (Jabodetabek) megapolitan area with 5.13 million populations. Recently, Bogor Regency has developed as the residence for the urbanites and industrial center area. The infrastructure and economy in Bogor are developing very quickly. The number of private vehicle owners increases rapidly along with the development of the economics of the locals. This condition causes road congestion because there is no further development in supporting facilities for transportation. Currently, transportation modes have become very important things for the residences of the city. This could happen because transportation is the most important thing to accelerate the economics of a city. Therefore, a solution is needed to reduce road congestion by maximizing the available public transportation such as the Commuter Line.
One of the solution that can be applied is to build a Park and Ride building as the supporting facilities on Bojong Gede Station, Bojong Gede District, Bogor Regency. There are some supporting data as the promary and secondary data required for the planning of park and ride building. The primary data are the passenger volume and the data of thepassenger questionnaire survey. These daata were obtained from a direct survey at the planning location from 06.00-08.00 Western Indonesian Times. This was the peak hour where the people mostly used the commuter line to go to Jakarta as well as to Bogor City. The secondary data are the data from the relevant office and the literature reviews. Both the primary and secondary data are processed to plan a layout of the park and ride building in Bojong Gede Station.
According to the data process with Microsoft Excel, it can be determined the demand for the park and ride users respectively for the motorcycle is 3,454 and the private car is 192. This planning was conducted for the 5 years lifespan demand as far as 2024. Based on the demand that has calculated, this park and ride building has 8 parking floors and 1 floor for platform access that can accomodate 3,479 motorcycles and 193 private cars.

Item Type: Thesis (Other)
Additional Information: KPS 625.7 Alf p-1 2020
Uncontrolled Keywords: Commuter Line, Kabupaten Bogor, Park and Ride, Stasiun Bojong Gede
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE7 Transportation--Planning
Divisions: Faculty of Civil Engineering and Planning > Geomatics Engineering > 29202-(S1) Undergraduate Thesis
Depositing User: Al Farisi Salman
Date Deposited: 22 Jun 2023 07:22
Last Modified: 22 Jun 2023 07:22
URI: http://repository.its.ac.id/id/eprint/72976

Actions (login required)

View Item View Item