Pramajulinda, Sharas Tri (2020) Kajian Perbandingan Tiga Schedule Yang Berbeda Pada Proyek Peningkatan Dermaga Dan Container Yard Di Tanjung Priok. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
04311540000042-undergraduate_thesis.pdf Download (7MB) | Preview |
Abstract
Dalam membuat jadwal proyek, sebenarnya diperlukan suatu teknis analisis untuk mengantisipasi ketidakpastian durasi proyek suatu konstruksi. Cara yang umum digunakan untuk ketidakpastian pada penjadwalan adalah dengan menganalisis penjadwalan tersebut secara probabilistik (probabilistic scheduling). Pada penelitian ini dilakukan simulasi Monte Carlo pada durasi optimis, paling disukai, dan pesimis setiap detail pekerjaan proyek. Simulasi pada penelitian ini dilakukan dengan menggunakan bantuan dari software @RISK dan distribusi yang digunakan adalah distribusi triangular. Durasi hasil simulasi tiap detail pekerjaan kemudian digunakan untuk membuat jadwal ulang dengan bantuan software Microsoft Project dan Microsoft Excel, sehingga akan didapatkan durasi total dan kurva S. Hasil dari simulasi menunjukkan bahwa durasi total proyek adalah 427 hari dan memiliki probabilitas sebesar 75%, sedangkan total durasi rencana adalah 413 hari dan memiliki probabilitas sebesar 40%. Sedangkan untuk kurva S dari jadwal rencana dan jadwal simulasi tidak memiliki perbedaan yang mencolok karena durasi total dari keduanya hanya selisih dua minggu dengan jadwal simulasi yang lebih lambat. Tetapi jika keduanya dibandingkan dengan jadwal realisasi di lapangan, kurvanya jauh berbeda karena jadwal realitas lebih lambat 8 minggu dari jadwal rencana dan lebih lambat 6 minggu dari jadwal simulasi.
==============================================================================================================================
To make a project schedule, actually a technical analysis is needed to anticipate the uncertain duration of a construction project. The commonly used way for uncertainty in scheduling is to analyze the scheduling probabilistically (probabilistic scheduling). In this study a Monte Carlo simulation is performed on the optimistic, most likely, and pessimistic duration of every detail of project. The simulation in this study was carried out using the help of @RISK software and the distribution used was a triangular distribution. The duration of the simulation results for each work detail is then used to re-schedule with the help of Microsoft Project and Microsoft Excel software, so that the total duration and S curve will be obtained. The results of the simulation show that the total duration of the project is 427 days and has a probability of 75%, while the total the duration of the plan is 413 days and has a probability of 40%. As for the S curve of the planned schedule and the simulation schedule, there is no significant difference because the total duration of the two is only two weeks. But if they are compared with the realization schedule in the field, the curves are much different because the reality schedule is 8 weeks slower than the planned schedule and 6 weeks slower than the simulation schedule.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Simulasi Monte Carlo, Probabilistik, Kurva S |
Subjects: | T Technology > T Technology (General) > T174.5 Technology--Risk assessment. T Technology > T Technology (General) > T56.8 Project Management T Technology > T Technology (General) > T57.62 Simulation |
Divisions: | Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis |
Depositing User: | Pramajulinda Sharas Tri |
Date Deposited: | 20 Jun 2024 11:08 |
Last Modified: | 20 Jun 2024 11:08 |
URI: | http://repository.its.ac.id/id/eprint/73196 |