Konsep Desain Pembangkit Listrik Terapung untuk Pulau Raas, Kabupaten Sumenep

Firmansyah, Hilmi (2020) Konsep Desain Pembangkit Listrik Terapung untuk Pulau Raas, Kabupaten Sumenep. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of Hilmi Firmansyah_04111240000027.pdf]
Preview
Text
Hilmi Firmansyah_04111240000027.pdf

Download (6MB) | Preview
[thumbnail of 04111240000027-Undergraduate_Theses.pdf] Text
04111240000027-Undergraduate_Theses.pdf

Download (6MB)

Abstract

Energi listrik merupakan sesuatu yang akrab dengan kehidupan manusia dimana aktivitas manusia sebagian besar membutuhkan energi. Sebagai negara kepulauan, Indonesia masih kurang akan pasokan listrik. Kondisi ini disebabkan oleh beberapa faktor, diantaranya karena kurang meratanya pembangunan pada beberapa daerah di Indonesia. Salah satu daerah yang belum mendapatkan listrik secara merata adalah Pulau Raas. Pulau ini hanya menerima pasokan listrik untuk 12 jam saja setiap hari. Dalam tugas akhir ini akan didesain Pembangkit Listrik Terapung sebagai unit pembantu untuk Pulau Raas. Listrik yang digunakan diasumsikan berguna untuk memenuhi kebutuhan listrik di Pulau Raas untuk 20 tahun kedepan. Dalam Tugas Akhir ini di peroleh payload untuk Pulau Raas di tahun 2036 sebesar 15,07 MW. Dengan menggunakan metode geosim didapatkan ukuran utama pembangkit listrik terapung sebesar L = 53 m, B = 24,2 m, T = 2,1 m, H = 3,9 m. Selanjutnya dari ukuran utama yang diperoleh dibuat Gambar Rencana Garis, Gambar Rencana Umum, Model 3D, serta melakukan analisis ekonomisnya.
================================================================================================================================
Electrical energy is something that is familiar with human life where most human activities require energy. As an archipelago, Indonesia is still lacking in electricity supply. This condition is caused by several factors, including the lack of equitable development in several regions in Indonesia. One area that has not received electricity evenly is Raas Island. The island only receives electricity for 12 hours each day. In this final project, a Floating Power Plant will be designed as a supporting unit for Raas Island. The electricity used is assumed to be useful to meet electricity needs on Raas Island for the next 20 years. In this Final Project, the payload for Raas Island in 2036 is 15.07 MW. Using the geosim method, the main main size of the floating power plant is L = 53 m, B = 24.2 m, T = 2.1 m, H = 3.9 m. Furthermore, from the main measurements obtained, Lines Plan, General Arrangemet, 3D Model, and conduct an economic analysis.

Item Type: Thesis (Other)
Additional Information: RSPe 623.812 9 Fir k-1
Uncontrolled Keywords: Pembangkit Listrik Terapung, Pulau Raas, konsep desain
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM297 Ships Designs and drawings
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Mr Hilmi Firmansyah
Date Deposited: 22 Jul 2024 01:39
Last Modified: 22 Jul 2024 01:39
URI: http://repository.its.ac.id/id/eprint/73868

Actions (login required)

View Item View Item