Konsep Pemanfaatan Pasang Surut Air Laut Sebagai Pembangkit Listrik di Teluk Bintuni Papua Barat

Ramadhan, Rifky Basysyar (2020) Konsep Pemanfaatan Pasang Surut Air Laut Sebagai Pembangkit Listrik di Teluk Bintuni Papua Barat. Diploma thesis, Institut Teknologi Sepuluh November.

[thumbnail of 10111815000031-Undergraduate_Thesis.pdf]
Preview
Text
10111815000031-Undergraduate_Thesis.pdf

Download (3MB) | Preview

Abstract

Sulitnya akses pelayanan dan pemasangan jaringan listrik di daerah sekitar pesisir pantai menjadi faktor penyebab tidak meratanya sebaran jaringan listrik, serta PT PLN belum mampu menyediakan energi listrik seiring pesatnya kebutuhan listrik di masyarakat dan industri, terutama di daerah-daerah seperti di Papua Barat. Belum lagi pembangkit listrik yang banyak digunakan di Indonesia sangat mengandalkan pemanfaatan Bahan Bakar Minyak (BBM) atau minyak bumi sebagai salah satu sumber energi untuk menghasilkan listrik. Indonesia adalah sebuah negara kepulauan yang memiliki area perairan yang luas. Laut menyimpan energi yang dapat dimanfaatkan sebagai energi terbarukan. Besarnya potensi energi yang dapat dihasilkan dari laut sehingga dimungkinkan untuk peningkatan pemanfaatkan sumber energi yang murah, ramah lingkungan dan terbarukan. Oleh karena itu dibutuhkan suatu sistem pembangkit yang efisien, dan ramah lingkungan dapat memenuhi seluruh kebutuhan energi. Energi laut yang dapat dimanfaatkan dibagi menjadi tiga, yaitu energi ombak, energi pasang surut, dan energi panas laut. Pada daerah Teluk Bintuni Papua Barat memiliki potensi energi pasang surut sebagai sumber pembangkit listrik. Dimana di Teluk Bintuni memiliki beda ketinggian pada saat keadaan pasang dan surut dengan rata – rata 3.5 - 5 m. Dalam perencanaan pembangkit listrik tenaga pasang surut di Teluk Bintuni analisa awal yang dilakukan adalah analisis Pasang Surut. Pada perencanaan ini menggunakan metode dam pasang surut yang menggunakan dua kolam. Selanjutnya menghitung kapasitas kedua kolam. Analisa selanjutnya memilih tinggi pasang dan tinggi surut untuk perencanaan. Dalam perencanaan ini menggunakan elevasi MHWL dan MLWL dimana tinggi MHWL 4,6m dan tinggi MLWL 1,2m. Selanjutnya menghitung pola pengisian kolam. Kemudian analisis daya listrik, energi yang dapat dihasilkan sebesar 10,5 MWh.
=================================================================================================================================
Difficult acces to services and installation of electicity networks in areas around the coast become a factor causing uneven distribution of electricity networks, and PT PLN has not been able to provide electricity along with the rapid demand for electicity in the community and industry, especially in areas such as West Papua. Not to mention the power plants that are widely used in Indonesia rely heavely on the use of fuel (BBM) or petroleum as one source of energy to produce electricity. Indonesian is an island nation that has large area of water. The ocean strores energy that can be used as renewable energy. The great potential of energy that can be produced from the sea that it is possible to increase the utilization of cheap, environmentally friendly and renewable energy sources. Therefore we need an efficient, environmentally friendly generating system that can meet all energy needs. Ocean energy that can be utilized is divided into three, namely wave energy, tidal energy, and ocan thermal energy, In the Bintuni Bay area has tidal potential as a source of electricity generation where in the Bintuni Bay have different heights at high tide and low tide with an average 3,5-5m. In the planning odf tidal power plant in Bintuni Bay, the initial analysis carried out is the Tidal analysis. In this plan use the tidal dam method which uses two ponds. Next calculate the capacity of both ponds. The next analysis chooses high tides and low tides for planning. In this plan use he elevation of MHWL and MLWL, where the MHWL height is 4,6m and the height of MLWL is 1,2m. Next calculate the pond filling pattern. Then the analysis of electric power, the energy that can be produced is 10,5MWh.

Item Type: Thesis (Diploma)
Additional Information: RSIS 627.12 Ram k-1 2020
Uncontrolled Keywords: Teluk Bintuni, PLTA, Pasang Surut dan Energi pasang surut
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TC Hydraulic engineering. Ocean engineering > TC147 Ocean wave power.
T Technology > TC Hydraulic engineering. Ocean engineering > TC424 Water levels
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Rifky Basysyar Ramadhan
Date Deposited: 03 Apr 2024 03:42
Last Modified: 03 Apr 2024 03:42
URI: http://repository.its.ac.id/id/eprint/74606