Perencanaan Jalan Tol Sukabumi – Padalarang Ditinjau Dari Kelayakan Ekonomi Dan Finansial

Indrayana, Arya (2020) Perencanaan Jalan Tol Sukabumi – Padalarang Ditinjau Dari Kelayakan Ekonomi Dan Finansial. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111340000124-Undergraduate_Thesis.pdf] Text
03111340000124-Undergraduate_Thesis.pdf

Download (3MB)

Abstract

Padalarang memerlukan pertimbangan ekonomi dan finansial. Pertimbangan ekonomi dibutuhkan untuk mengetahui manfaat dari adanya jalan tol Sukabumi – Padalarang terhadap masyarakat sekitar, sedangkan pertimbangan finansial dibutuhkan sebagai acuan dalam investasi agar jalan tol ini merupakan perencanaan yang efisien. Oleh karena itu perlu dilaksanakan PERENCANAAN JALAN TOL SUKABUMI-PADALARANG DITINJAU DARI KELAYAKAN EKONOMI DAN FINANSIAL agar mengetahui apakah jalan tol ini layak untuk dibangun. Metodologi yang dipakai untuk menganalisis Biaya Operasional Kendaraan (BOK) dan nilai waktu (time value) menggunakan metode Jasa Marga. Untuk menganalisis aspek kelayakan ekonomi menggunakan parameter BCR dan NPV sebagai acuan kelayakan. Sedangkan untuk menganalisis kelayakan finansial keuntungan didapatkan dari pendapatan jalan tol menggunakan tarif yang telah direncanakan dan menggunakan parameter BCR, NPV, dan IRR sebagai acuan kelayakan. Dari hasil analisis didapatkan kelayakan ekonomi BCR sebesar 2,51 > 1 dan nilai NPV sebesar Rp 11.582.529.466.479,80 > 0. Untuk kelayakan finansial didapatkan nilai BCR sebesar 2,47 > 1 dan nilai NPV sebesar Rp 11.250.417.138.120,8 > 0 dan nilai IRR sebesar 10,11 % > 5,63 % (MARR). Serta waktu Payback Period selama 20 Tahun 10 Bulan 30 Hari. Berdasarkan hasil tersebut maka dapat disimpulkan pembangunan jalan tol Sukabumi – Padalarang layak dari segi ekonomi dan finansial.
==============================================================================================================================
The planning of Sukabumi – Padalarang toll road needs economic and financial feasibility as its consideration. Economic feasibiity is needed to determine the benefit of the Sukabui – Padalarang toll road to its surronding, while financial feasibility is needed as refference for investor to make it more efficient in investing for Sukabumi – Padalarang toll road. Therefore it is necessary to carry out Planning of Sukabumi – Padalarang Toll Road based on Economic and Financial Feasibility to know whether the toll road is feasible to build. To analyze Vehicle Operational Cost (BOK) and Time Value the author used Jasa Marga Method. To analyze the economic feasibility is using BCR and NPV parameters as the feasibility refference. Meanwhile, to analyze the finanscial feasibility is using BCR, NPV, and IRR parameters as refference and profit itself obtained by toll road revenues using the planned tariffs. From the analysis obtained, economic feasibility value of BCR is 2,51 > 1 and NPV value is Rp 11.582.529.466.479,80 > 0. For the financial feasibility parameters obtained are BCR 2,47 > 1,NPV Rp 11.250.417.138.120,8 > 0, and IRR value 10,11 % > 5,63 % (MARR). As well as payback period time for 10 years, 3 months, and 1 week. Based on these results, can be concluded that the development of Sukabumi – Padalarang toll oad is feasible in term of economic and financial.

Item Type: Thesis (Other)
Additional Information: RSS 388.114 Ind p-1 2020
Uncontrolled Keywords: Perencanaan Jalan Tol Sukabumi–Padalarang, Kelayakan Ekonomi dan Finansial
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Muhammad Arya Indrayana
Date Deposited: 07 Mar 2025 07:45
Last Modified: 07 Mar 2025 07:46
URI: http://repository.its.ac.id/id/eprint/74614

Actions (login required)

View Item View Item