Darmawan, Muhammad Didi (2016) Pembuatan Alur Pelayaran Dalam Rencana Pelabuhan Marina Pantai Boom, Banyuwangi. Undergraduate thesis, Instititut Teknologi Sepuluh Nopember Surabaya.
Preview |
Text
3512100046-Undergraduate_Thesis.pdf - Published Version Download (2MB) | Preview |
Abstract
Pantai Boom merupakan pantai yang ada di Kabupaten
Banyuwangi. Pantai ini terletak di Kelurahan Kampung Mandar,
Kecamatan Banyuwangi, Banyuwangi, Jawa Timur. Pantai
tersebut rencananya akan dibangun pelabuhan marina.
Pelabuhan harus dilengkapi dengan beberapa fasilitas untuk
mendukung rencana tersebut seperti salah satunya adalah alur
pelayaran. Untuk membuat alur pelayaran diperlukan penelitian
mengenai pasang surut, topografi dasar laut, serta jenis kapal
yang melintas untuk memastikan kapal yang berlayar aman dari
kemungkinan kecelakaan.
Penelitian ini menggunakan data hasil pemeruman, data
pasang surut yang diperoleh dari pengamatan langsung, serta
berbagai jenis kapal yacht. Hasil dari penelitian ini didapatkan
bahwa rencana dermaga sebaiknya dibangun 60 meter menjorok
ke arah laut dengan panjang dermaga 25 meter. Dalam keadaan
air rendah terendah (LLWL), ketiga jenis kapal yang ditentukan
dapat merapat ke rencana Dermaga Pelabuhan Marina Pantai
Boom, Banyuwangi. Daerah yang tidak bisa dilewati pada saat
LLWL, pada saat MSL daerah tersebut sudah dapat dilewati oleh
ketiga jenis kapal tersebut. Pada keadaan muka air tinggi
tertinggi (HHWL), Kapal Yacht Class 8 dan 6 dapat melewati
sebagian perairan sungai Pantai Boom. Waktu yang tidak tepat
untuk melakukan pelayaran pada saat LLWL dari alur pelayaran
yang telah dibuat yaitu antara pukul 04:00 – 06:00 WIB pada
saat bulan November 2015-Februari 2016 dan pukul 16:00-18:00
pada saat bulan Juni-Agustus 2016. Sedangkan Waktu yang tepat
vi
untuk melakukan pelayaran pada saat HHWL yaitu antara pukul
20:00–23:00 WIB pada saat bulan Desember 2015- Maret 2016
dan pukul 8:00-11:00 pada saat bulan Juni-September 2016
============================================================================================= Boom is one of the beaches in Banyuwangi. The beach is
located in Kampung Mandar village, Banyuwangi, East Java.
Marina harbour will be built at Boom Banyuwangi. In order to
build the harbor it is needed facilities such as shipping lanes. It is
required researchs on tide, seabed topography, and also the types
of ship to make the shipping lanes. They are needed to ensure that
the crossing ships are spared from possible accidents.
This study uses bathymetry data, tidal data which are
obtained from direct observation, and various types of yachts.
The results of this study, it is found that the dock should be built
60 meters juts into the sea with 25 meters dock length. In
circumstances of Lowest Low Water Level (LLWL), 3 determined
types of ships can move closer into the dock. Areas that can not
be sailed at the time of LLWL, when MSL (Mean Sea Level) those
areas can already be passed by all three types of ships. On
HHWL condition, Yacht Class 8 and 6 can sail on some river part
of Boom. The inappropriate time to sail on LLWL condition of
the shipping lanes that has been made is between 04:00 to 6:00
a.m. during November 2015 to February 2016 and 16:00-18:00
p.m. during June to August 2016. The appropriate time to sail on
HHWL condition of the shipping lanes that has been made is
between 20:00-23:00 p.m. during December 2015 to March 2016
and 8:00-11:00 a.m. during June to September 2016
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSG 551.468 3 Dar p |
Uncontrolled Keywords: | Alur, Kapal, Pantai Boom, Pelabuhan Marina |
Subjects: | G Geography. Anthropology. Recreation > G Geography (General) > G70.217 Geospatial data |
Divisions: | Faculty of Civil Engineering and Planning > Geomatics Engineering > 29202-(S1) Undergraduate Thesis |
Depositing User: | EKO BUDI RAHARJO |
Date Deposited: | 19 Feb 2020 10:51 |
Last Modified: | 19 Feb 2020 10:51 |
URI: | http://repository.its.ac.id/id/eprint/75055 |
Actions (login required)
View Item |