Purwanto, Eko (2015) Penentuan Kisaran Harga Jual Tenaga Listrik Dan Risiko Investasi Rehabilitasi Gas Turbine (Studi Kasus PT. X). Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
9112201408-Master_Thesis.pdf - Accepted Version Download (4MB) | Preview |
Abstract
Untuk meningkatkan pendapatan perusahaan, PT. X berencana menjual
kelebihan tenaga listrik yang diproduksi ke PLN. Rencana tersebut
dilatarbelakangi oleh adanya potential capacity pada fasilitas cogeneration plant
terpasang sebesar 6 MW dan adanya regulasi pemerintah tentang patokan harga
pembelian tenaga listrik yang menarik bagi perusahaan penyedia listrik. Investasi
berupa rehabilitasi gas turbine harus dilakukan sebelum kontrak jual beli tenaga
listrik dengan PLN untuk meningkatkan kapasitas dan kehandalan cogeneration
plant terpasang.
Penelitian ini bertujuan untuk menentukan kisaran harga jual tenaga listrik
yang layak bagi PT. X sekaligus dapat diterima oleh PLN dan untuk menentukan
profil risiko pada tingkat pengembalian investasi yang diakibatkan oleh fluktuasi
variabel harga bahan bakar gas alam tingkat inflasi US. Kedua variabel tersebut
mempengaruhi biaya pokok pembangkitan tenaga listrik dan dikategorikan
sebagai variabel kritis karena fluktuasi nilainya disebabkan oleh faktor–faktor
eksternal yang tidak dapat dikendalikan oleh perusahaan penyedia listrik.
Perhitungan harga jual tenaga listrik dilakukan menggunakan sebuah
model keuangan yang dibangun untuk menggambarkan kondisi investasi dalam
bahasa akuntansi. Dengan menggunakan model tersebut diperoleh kisaran harga
yang layak sebesar 8.03-8.60 cent USD/kWh. Profil risiko pada tingkat
pengembalian investasi ditentukan menggunakan model simulasi Monte Carlo.
Hasil simulasi menunjukkan bahwa kemungkinan investasi menjadi tidak layak
disebabkan oleh fluktuasi variabel kritis mencapai 72.198%.
=================================================================================================
PT X planned to sell the produced electricity to PLN to increase their
revenue. This planning is developed as their cogeneration plant has idle capacity
of 6 MW and government released electricity regulation that offers attractive
electricity tariff. Investment in rehabilitation the existing gas turbine shall be
implemented prior to dealing with PLN with the aim of increasing the capacity
and reliability of existing cogeneration plant.
This research is conducted for determining the range of electricity sell
price that feasible for PT X and acceptable for PLN, and identifying the risk
profile on investment return resulting from changes of both variables of natural
gas fuel price and US inflation rates. Both variabels are critical as they fluctuate
simultaneously and affected by various external factors that beyond of electricity
provider company.
Calculation of electricity sell price is conducted by using a finance model
that developed to represent the investment condition in accounting perspective. In
using that model, for range of feasible electricity sell price is 8.03-8.6 cent
USD/kWh. Risk on investment return is determined by using Monte Carlo
simulation model. Simulation result reveals that the probability of investment
tends to unfeasible resulting from fluctuation of critical variabels is 72.198%.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTMT 628.155 2 Pur p |
Uncontrolled Keywords: | harga jual tenaga listrik, risiko pada tingkat pengembalian investasi,variabel kritis |
Subjects: | H Social Sciences > HB Economic Theory > HB846.2 Cost benefit analysis |
Divisions: | 61101-Magister Management Technology |
Depositing User: | Yeni Anita Gonti |
Date Deposited: | 20 Feb 2020 03:59 |
Last Modified: | 20 Feb 2020 03:59 |
URI: | http://repository.its.ac.id/id/eprint/75072 |
Actions (login required)
View Item |