Koordinasi Proteksi Sebagai Upaya Pencegahan Terjadinya Sympathetic Trip Di Kawasan Tursina, PT. Pupuk Kaltim

Calmara, Ekka Sheilla (2016) Koordinasi Proteksi Sebagai Upaya Pencegahan Terjadinya Sympathetic Trip Di Kawasan Tursina, PT. Pupuk Kaltim. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2214105101-Undergraduate_Thesis.pdf]
Preview
Text
2214105101-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Dalam sistem tenaga listrik diperlukan sistem tenaga listrik yang
dapat menjamin keandalan penyaluran. Semakin besar jumlah gangguan,
berarti keandalan sistem makin rendah begitu juga sebaliknya. Salah satu
gangguan yang sering terjadi adalah Sympathetic Trip Peristiwa ini pada
umumnya disebut trip ikutan atau palsu. Hal ini dapat mengganggu
keandalan system dan kontinuitas sistem jaringan yang sehat. Hal ini
terjadi pada PT. Pupuk Kaltim, saat ada gangguan hubung singkat. Pada
saat gangguan terjadi di Tursina pada bus TUS-SG-001, terjadi trip
simpatetik di island lain, terutama pada island tanpa impedansi seperti
Kanibungan, pada rele OCR_INCK5 dan rele backup nya karena karena
arus gangguan yang dirasakan terlalu besar, yakni mencapai 8.141 kA.
Oleh sebab itu untuk mengurangi arus gangguan hubung singkat tersebut
digunakan suatu impedansi tambahan yaitu Insulated Transformer. Trafo
ini dipasang pada bagian outgoing Tursina menuju ring PT. Pupuk Kaltim
Pemasangan Trafo dapat mengurangi besarnya arus hubung singkat pada
bus TUS-SG-01 dan TU-SG-01 dari 8.141 kA menjadi 1.75 kA.
Pemasangan Insulated Transformer sebesar 25 MVA menunjukkan arus
hubung singkat semakin berkurang sehingga mengakibatkan terjadinya
perubahan koordinasi proteksi rele arus lebih pada Tursina. Studi
koordinasi dilakukan untuk mengetahui apakah sistem pengaman bekerja
dengan baik. Hasil analisa hubung singkat serta studi koordinasi proteksi
akan ditampilkan dalam bentuk kurva time current characteristic (TCC).
========================================================================================================================
Maintain a good reliability of power system is a must. Reliability is
one of the important thing in power system. The bigger the fault, the
smallest the reliability and vice versa. Sympathetic trip is one of the fault
which often happen at power system, it’s generally called as fake trip.
This event can disrupt power system and the continuity of the healthy
system. At PT. Pupuk Kaltim, Sympathetic Trip happen as a disturbance.
When fault happen at one of the bus in Tursina, especially at Bus TUSSG-
01 and TU-SG-01 overcurrent relay from Kanibungan like
OCR_INCK5 and it’s backup sense this fault, so the breaker is open. Short
circuit current from Kanibungan is too much, about 8.141 kA. Thus, it
needs an additional impedance to limit it’s current, such as Insulated
Transformer. This transformer placed on the outgoing part of Tursina
which connected Tursina and Ring part of PT. Pupuk Kaltim. A 25 MVA
Transformer installation can reduce short circuit current from 8.141 kA
to 1.75 kA. Because of transformer installation, contribution current from
Tursina itself is reduce, so that it needs a resetting for its overcurrent
relay coordination-protection. The result of short circuit analysis and
protection-coordination will showed in time current characteristics
(TCC

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.317 Cal k
Uncontrolled Keywords: Insulated Transformer, Koordinasi Proteksi, Rele Arus Lebih, Sympathetic Trip, Time Current Characteristic (TCC)
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis