Hidayat, Agriananta Fahmi (2012) Pengendalaian persediaan material dengan pendekatan continuous review (s,S) (studi kasus : PT. PLN Persero APJ Gresik). Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
9108201415-Master_Thesis.pdf - Accepted Version Download (2MB) | Preview |
Abstract
Pada sistem perawatan ketersediaan material sangat menentukan tingkat layanan. Bagi PT PLN Persero APJ Gresik ketersediaan material akan mempengaruhi kemampuannya dalam penyediaan listrik bagi pelanggan. Penelitian ini mengangkat masalah pengendalian persediaan material untuk kegiatan perawatan di PT PLN Persero APJ Gresik. Metode yang digunakan dalam penelitian ini adalah pendekatan sistem continuous review sS dimana s adalah reorder point dan S adalah stok maksimum. Material diklasifikasikan untuk diketahui karakteristik permintaan tiap material. Simulasi dilakukan dengan menaikkan dan menurunkan nilai-nilai s dan S pada suatu interval dan menentukan service level target adalah 95 dimana alternatif yang dipilih adalah hasil simulasi yang memenuhi service level target dengan total cost yang paling minimum. Hasil simulasi mengindikasi bahwa nilai sS yang diperoleh dari rumus tidak selalu memberikan service level dan total biaya yang terbaik. Dengan menaikkan atau menurunkan nilai s dan S pada suatu interval akan diperoleh perbaikan baik dari sisi service level danatau biaya total. Rata-rata dari 43 material yang dianalisis untuk total biaya mengalami penurunan sebesar 101 dan untuk service level mengalami peningkatan sebesar 310
================================================================================================
In the maintenance system the availability of materials will determine the service level. For PT PLN Persero APJ Gresik it will also affect their ability to supply electricity for customer. This study assigned the issue of inventory control of materials for maintenance activities at PT PLN Persero APJ Gresik. This study is using system approach to continuous review sS method where s is the reorder point and S is the maximum stock. Material is classified to know the characteristic of each material demand. Simulation is performed by increasing and decreasing s and S value on a certain interval with 95 service level target. The simulation result should comply with service level target which has minimum total cost. The simulation result indicated that the value sS obtained from the formula did not always provided the best service level and total cost. . Better improvement for service level andor total cost will be obtained by increasing and decreasing s and S value in certain interval. In summary from 43 materials analyzed average of total cost has decreased 101 and for service level has increased 310
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTMT 658.787 Hid p |
Uncontrolled Keywords: | Material; pengendalian persediaan; continuous review |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD55 Inventory control |
Divisions: | 61101-Magister Management Technology |
Depositing User: | Yeni Anita Gonti |
Date Deposited: | 24 Feb 2020 02:17 |
Last Modified: | 24 Feb 2020 02:17 |
URI: | http://repository.its.ac.id/id/eprint/75126 |
Actions (login required)
View Item |