Analisa Tingkat Kematangan Smartgrid Di Kantor Pusat Kementerian Pekerjaan Umum Dan Perumahan Rakyat Menggunakan Smartgrid Maturity Model Dan Cobit 5

Kurniawan, Dedy Dwi (2016) Analisa Tingkat Kematangan Smartgrid Di Kantor Pusat Kementerian Pekerjaan Umum Dan Perumahan Rakyat Menggunakan Smartgrid Maturity Model Dan Cobit 5. Undergraduate thesis, Institut Technology Sepuluh Nopember.

[thumbnail of 9113202808-Master_Thesis.pdf]
Preview
Text
9113202808-Master_Thesis.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Penggunaan energi di gedung Kementerian PUPR tahun 2015
mendapatkan predikat Boros, berdasarkan Intensitas Konsumsi Energi (IKE)
sebesar 19,228. Penghematan yang telah dilakukan adalah pembentukan gugus
penghematan energi dan air dengan melakukan operasional manual terhadap lift
dan AC central. Terkadang pengelola melupakan kesempatan untuk melakukan
penghematan yang lebih baik, yaitu dengan mengimplementasikan smart system
pada utilitas yang ada. Integrasi Information Communication and Technology
dengan Utilitas ini disebut juga dengan Smart Grid.
Untuk mengukur kesiapan Kementerian PUPR dalam
mengimplementasikan smart grid dapat dilakukan dengan menggunakanSmart
Grid Maturity Model(SGMM), tetapi model ini hanya mengukur atribut
kematangan saja bukan proses model, sehingga hasilnya belum menggambarkan
apa yang organisasi benar-benar mampu lakukan
Penggunaan CoBiT 5 yang merupakan proses model melengkapi
keterbatasan Smart Grid Maturity Model dalam melakukan analisa Smart Grid,
sehingga manfaat yang dihasilkan lebih optimal. Analisa Smart Grid Maturity
Model difokuskan pada tujuan smart grid Kementerian Pekerjaan Umum dan
Perumahan Rakyat
Pemetaan enterprise goal menghasilkan 5 tujuan enterprise, selanjutnya
berdasarkan hasil pemetaan IT Related Goal didapatkan 13 IT related goal, dari 13
IT related goal ini menghasilkan 21 IT proses yang frekuensi kemunculan pada IT
Related Goal tinggi yaitu sebanyak 4 dan 3 kali sebagai berikut EDM 01, EDM
02,EDM 03, EDM 04, EDM 05 APO 01.APO 04,APO 05, APO 07,APO 08,APO
10, APO 11, APO 12, APO 13,BAI 01,BAI 02, BAI 06, DSS 01,DSS 03 dan MEA
01. Ada 1 proses yang berada pada tingkat kapabilitas level 0 Incomplete yaitu
APO 03dan 20 proses berada pada tingkat kapabilitas level 1 Performed Process,
Sedangkan target level yang diharapkan adalah level 3 Established Process, serta
melakukan prioritas pengembangan Smart Grid di Kementerian PUPR dengan
melakukan rekomendasi perbaikan proses yang ada.
========================================================================================================
Energy use in the building of the Ministry of PUPR 2015 awarded Boros,
based on Energy Consumption Intensity (IKE) amounted to 19.228. The savings
that have been made is the formation of the group energy and water savings by
manual operation of the elevator and central air conditioning. Sometimes
managers forgot the opportunity to make savings better, namely by implementing
smart system on existing utilities. Integration of Information Communication and
Technology with this utility is also called the Smart Grid.
To measure the readiness of the Ministry PUPR in implementing smart
grid can be done by using the Smart Grid Maturity Model (SGMM), but this
model measures only attribute alone is not a process maturity model, so the
results do not describe what the organization is really capable of doing.
Use of COBIT 5, which is the model process of completing the limitations
of the model Smart Grid Maturity Model to analyze the Smart Grid, so that the
benefits generated more optimal. Smart Grid Maturity Model Analysis focused on
the smart grid of the Ministry of Public Works and Public Housing
Mapping the enterprise goal of producing 5 goal enterprise, then based
on the mapping of IT Related Goal earned 13 IT related field goal, from 13 IT
related goal is to produce 21 IT processes that the frequency of occurrence in IT
Related Goal high, as much as 4 and 3 times as follows EDM 01, 02 EDM, EDM
03, 04 EDM, EDM 01.APO 04 05 APO, APO 05, APO 07, 08 APO, APO 10, APO
11, APO 12, APO 13, BAI 01, 02 BAI, BAI 06, DSS 01, DSS 03 and the MEA 01.
There is one process that is at the level of capability level 0 Incomplete namely
APO 03 and 20 are at the level of process capability level 1 Performed process,
while the expected target level is level 3 Established process, as well as
prioritizing the development of Smart Grid Ministry PUPR by making
recommendations for improvement of existing processes.

Item Type: Thesis (Undergraduate)
Additional Information: RTMT 658.31 Kur a
Uncontrolled Keywords: ICT, Utilitas, Smart Grid, Smart Grid Maturity Model, COBIT 5, Smart System.
Subjects: T Technology > T Technology (General) > T58.6 Management information systems
Divisions: 61101-Magister Management Technology
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 02 Mar 2020 02:45
Last Modified: 02 Mar 2020 02:45
URI: http://repository.its.ac.id/id/eprint/75250

Actions (login required)

View Item View Item