Analisis Repowering PLTU Unit 3 PT. PJB UP Gresik Menggunakan Software Gatecycle dengan Mempertahankan Daya Steam Turbine Sebesar 200MW

Muhendra, R. Galuh (2015) Analisis Repowering PLTU Unit 3 PT. PJB UP Gresik Menggunakan Software Gatecycle dengan Mempertahankan Daya Steam Turbine Sebesar 200MW. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2112106015-Undergraduate_Thesis.pdf]
Preview
Text
2112106015-Undergraduate_Thesis.pdf - Accepted Version

Download (3MB) | Preview

Abstract

PT. PJB UP Gresik saat ini memiliki 2 unit pembangkit tenaga
uap (PLTU unit 1-2) yang masing - masing 100 MW, dan 2 unit
pembangkit tenaga uap (PLTU unit 3-4) yang masing - masing 200
MW. PLTU pada dasarnya memiliki efisiensi yang rendah, biasanya
hanya sekitar 25% sampai dengan 30%. Sehingga sedapat mungkin
harus diganti atau dimodifikasi agar efisiensinya dapat meningkat,
salah satunya adalah dengan metode Repowering.
Saat ini, repowering adalah salah satu metode yang biasanya
dilakukan untuk meningkatkan efisiensi dari pembangkit. Repowering
adalah metode untuk merubah unit pembangkit yang sudah ada,
dengan cara menambahkan beberapa gas turbin dan unit HRSG (heat
recovery steam generator) sebagai pengganti boiler pada unit steam
turbin. Repowering adalah salah satu cara paling efektif dalam
meningkatkan performance, dan memperpanjang umur unit,
meningkatkan kapasitas, mengurangi emisi, dan mengurangi panas
yang terbuang ke lingkungan. Sehingga prinsip kerja sistem yang
mulanya simple cycle dimodifikasi menjadi combine cycle.
Setelah simulasi dengan software Gate Cycle dilakukan,
HRSG yang digunakan adalah 3 unit HRSG tipe single pressure, dan
gas turbine yang dipakai adalah 3 unit gas turbine Mitsubishi seri
A701F dengan daya terpasang masing-masing 180.61 MW. Diperoleh
hasil yang menunjukkan adanya peningkatan performa dari sistem
pembangkit. Efisiensi siklus meningkat sebesar 6,27 %, dari yang
awalnya 40,12 % menjadi 46,39 %. Net power mengalami kenaikanviii
541,4 MW yaitu dari 197,6 MW menjadi 739,54 MW. Serta untuk nilai
heat rate mengalami penurunan dari 2143,24 kcal/kW-hr pada PLTU
design menjadi 1853,62 kcal/kW-hr pada PLTGU hasil repowering.
================================================================================================
act
PT. PJB UP Gresik currently has two units of steam power
plants (power plant units 1-2) which generates 100 MW, and two
units of steam power plant (power plant units 3-4) which generate
200 MW. Steam Power Plant basically has low efficiency,
typically only about 25% to 30%. So Steam Power Plant need to
be replaced or modified, so that efficiency can be increased. One
of many metode for increasing the efficiency is Repowering
Method.
Today, repowering is one of most method that is commonly
used to increase the efficiency of power plant. Repowering is a
method to change the existing steam generator units (boiler), by
adding some gas turbine and HRSG units ( heat recovery steam
generator) as a replacement boiler in the steam turbine units.
Repowering is one of the most effective ways to improve
performance and extend the life of the unit, increase capacity,
reduce emissions, and reduce the waste heat to the environment.
So the working principle of the system is basically
modified from simple cycle into combined cycle power plant.
HRSG that used are 3 units of single pressure HRSG, and gas
turbine that used are 3 units of gas turbine Mitsubishi A701F
series Which each Gas turbine generate power of 180.61 MW.
Simulation of power plant is build in Gate Cycle Software.. After
simulation with gatecycle software is done, the results is showedx
an increase in the performance of the generation system. Cycle
efficiency increased by 6,27%, from initial efficiency 40,12% to
46,39%. Nett Power increase by 541,4 MW from 197,6 MW to
739,54 MW. And for Heat rate has decreased from 2143,24
kcal/kW-hr to 1853,62 kcal/kW-hr at result of combine cycle
repowering.

Item Type: Thesis (Undergraduate)
Additional Information: RSM 621.165 Muh a
Uncontrolled Keywords: Efisiensi, Gate Cycle, HRSG, Power Plant, Repowering, Single Pressure
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK7 Turbogenerators. Steam-turbines
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis