Perencanaan Detail Dermaga Selatan Curah Cair Untuk Kapal 12.000 Dwt Di Perairan Utara Kabupaten Tuban, Jawa Timur

Wicaksana, Satya Wira (2016) Perencanaan Detail Dermaga Selatan Curah Cair Untuk Kapal 12.000 Dwt Di Perairan Utara Kabupaten Tuban, Jawa Timur. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[img]
Preview
Text
3111100131-Undergraduate_Thesis.pdf - Published Version

Download (3MB) | Preview

Abstract

Saat ini TPPI Tuban sedang sedang merencanakan tiga buah jetty baru, yaitu dua jetty untuk wilayah selatan dan satu jetty untuk wilayah utara. Direncanakannya jetty baru karena saat ini dermaga (jetty) exsisting sudah tidak cukup melayani arus bongkar muat minyak. Selain itu kilang Tuban perlu di tambah seiring dengan meningkatnya arus bongkat muat, penambahan kilang minyak bertujuan agar Indonesia tidak lagi mengandalkan kilang minyak dari luar negeri, dan bisa mengolah minyak mentah dari dalam negeri. Dengan melihat permasalahan yang ada, akibat meningkatnya arus bongkar muat, maka dibutuhkan suatu design struktur dermaga yang memenuhi standart dan dapat dilaksanakan di lapangan. Dalam tugas akhir ini jetty yang direncanakan yaitu jetty selatan yang terletak disebelah kanan. Untuk jetty selatan menyalurkan hasil Minyak MDO (Marine Diesel Oil) dan Minyak IFO (Intermediate Fuel Oil). Tujuan dari Tugas akhir ini adalah menghasilkan perencanaan struktur dermaga yang sesuai dengan standart perencanaan dermaga dan memenuhi syarat keamanan struktur. Hasil analisis perhitungan didapatkan kebutuhan jetty dengan ketentuan Loading Platform sebesar 24 x 18 m, Mooring Dolphin 2,8 x 2,8 m, Breasting Dolphin 4,8 x 4,8 m dan Catwalk ii dengan panjang 15 dan 7,5 meter. Rencana Anggaran biaya yang diperlukan untuk pembangunan jetty ini adalah Rp. 30.659.519.200 ===============================================================================================Nowadays TPPI Tuban is planning to build (3) three quays; 2 (two) in the South region and 1 (one) in the North region. The project is conducted due to the unability of the existing quay to carry out loading and unloading process of oil. Besides, Tuban’s refinery installation should be added in line with the intensity of oil loading and unloading process. Also, the refinery installation addition it means that Indonesia can do refinery process itself minimizing dependancy on forgein countries, and can process the raw oil domestically. Seeing the existing problem due to the increasing activities of oil loading and unloading process, it is needed to have quay structure design which can fulfil standart requitment and feasible to be constructed. In this final assignment, the will-be constructed quay is the one in the Southern right of the region. The Southern- position quay is meant to distribute the products of Marine Diesel Oil (MDO) and Intermediate Fuel Oil (IFO) . The objective of this final assignment is produce quay structure planning which can fulfill standart quay planning requirement resulting structurally safe quay. From calculation analysis is obtained the following specified capacity of quay: Loading platform with the size of 24 x 18 m; Mooring dolphin with the size of 2,8 x 2,8 m; Breating dolphin with the size of 4,8 x 4,8 m; and Catwalk as long as 7,5 and 15 m. The calculated budget for constructing the quay is IDR 30,659,159,200.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 627.31 Wic p
Uncontrolled Keywords: Dermaga Curah Cair, Perairan Kabupaten Tuban, Evaluasi Layout Perairan dan Daratan, Struktur, WBS, Rencana Anggaran Biaya, Kurva S.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC357 Harbor Engineering. Piers, quays, and wharves
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis