Analisa Keterlambatan Proyek Pembangunan Dermaga Pelabuhan Laut Calang

Wiryawan, Prathama Putra (2016) Analisa Keterlambatan Proyek Pembangunan Dermaga Pelabuhan Laut Calang. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4309100027-Undergraduate_Thesis.pdf]
Preview
Text
4309100027-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Seiring dengan meningkatnya kegiatan perekonomian masyarakat di propinsi Nanggroe Aceh Darussalam khususnya di kabupaten Aceh Jaya pasca bencana tsunami 26 Desember 2006, sehingga dibutuhkan sarana transportasi yang memadai dan sarana penunjang yang mendukung dengan membangun Dermaga Pelabuhan Laut Calang. Dalam proses pembangunannya dibutuhkan adanya sistem yang memudahkan dalam melakukan analisa keterlambatan proyek pembangunan jacket. Untuk dapat mengetahui penyebab keterlambatan pembangunan Dermaga Pelabuhan Laut Calang serta mengambil keputusan yang tepat dalam menagani keterlambatan proyek. Dengan metode fault tree analisys (FTA) didapatkan dua faktor utama penyebab keterlambatan proye yaitu faktor gangguan pada fabrikasi memiliki peluang sebesar 0,0473dan faktor manajemen kurang baik peluang sebesar 0,0107, sehingga Peluang keseluruhan dari keterlambatan pada proyek pembangunan Dermaga Pelabuhan Laut Calang dari FTA adalah 0,05801. Dampak – dampak dari keterlambatan proyek pembangunan Dermaga Pelabuhan Laut Calang menggunakan metode Event Tree Analysis adalah keterlambatan dengan waktu antara 2 minggu hingga 9 bulan yang diakibatkan oleh berbagai macam faktor dan dikenai denda berkisar antara Rp 31.950.020,- hingga Rp 6.326.103.960,-. Hasil dari diagram bow-tie dari dalam bentuk beberapa pencegahan ancaman(threat) dan beberapa pengaturan konsekuensi (consequence) dengan bantuan barrier.
==================================================================================================================
Due to improving the economic activity in the aceh especially in aceh jaya district post tsunami 26 december 2006 , so it needs means of transport sufficient and support facilities for supporting to build a dock seaports calang .In the process of the development needed the system analysis easier to delay the project jacket .For the delay dock construction calang sea port and taking the right decisions in menagani delay project .With the fault tree analisys ( FTA ) got two main factors cause delay proye namely the disorder of fabrication have a chance of management 0,0473dan factors less well as much as 0,0107 opportunities , so the whole of the late on the project dock construction calang sea port of fault tree analysis is 0,05801. The impact of delay dock construction project port calang uses the event tree analysis was the delay in with the time between two weeks and nine months of the caused by by various factors and were imposed with fines is ranging from Rp 31.950.020, - to Rp 6.326.103.960, -.The result of diagram bow-tie off in the form of some prevention threat ( threat and some arrangement a consequence ( consequence ) with the help of barrier.

Item Type: Thesis (Undergraduate)
Additional Information: RSKe 627.2 Wir a
Uncontrolled Keywords: Keterlambatan Proyek Pembangunan Dermaga, Fault Tree Analysis, Event Tree Analysis, Bow-Tie Analysis
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC205 Harbors--Design and construction.
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: ansi aflacha
Date Deposited: 13 Apr 2020 07:10
Last Modified: 13 Apr 2020 07:10
URI: http://repository.its.ac.id/id/eprint/75745