Analisis Risiko Lingkungan Pada Pelaksanaan Proyek Pembangunan Saluran Udara Tegangan Ekstra Tinggi (Sutet) 500 Kv Pltu 2 Jateng – Gitet 500 Kv Kesugihan

Santoso, Ahmad Sakti Budi (2016) Analisis Risiko Lingkungan Pada Pelaksanaan Proyek Pembangunan Saluran Udara Tegangan Ekstra Tinggi (Sutet) 500 Kv Pltu 2 Jateng – Gitet 500 Kv Kesugihan. Undergraduate thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 3113105014-Undergraduate_Thesis.pdf]
Preview
Text
3113105014-Undergraduate_Thesis.pdf - Published Version

Download (3MB) | Preview

Abstract

Untuk menyalurkan tenaga listrik dari pembangkit ke permukiman, kawasan industri dan lain sebagainya, harus melalui Saluran Udara Tegangan Ekstra Tinggi (SUTET). Pembangunan SUTET berpotensi menimbulkan beberapa dampak dan risiko terhadap lingkungan di sekitar proyek. Perlu dilakukan manajemen risiko dalam mengendalikan dan memonitor risiko yang muncul selama tahap prakonstruksi dan konstruksi. Tugas akhir ini bertujuan untuk mengidentifikasi risiko lingkungan dan menganalisis risiko lingkungan yang terjadi. Tahap awal penelitian ini adalah melakukan identifikasi risiko dengan cara studi literatur, observasi lapangan dan wawancara. Langkah selanjutnya melakukan analisis risiko yang bertujuan untuk mengetahui tingkatan risiko dari suatu kejadian berdasarkan hasil penilaian probabilitas dan dampak dengan menggunakan matriks risiko. Dari hasil penelitian diperoleh 4 (empat) variable risiko yang dominan yaitu perubahan fungsi tanah perkebunan atau pertanian, perubahan lapangan pekerjaan, keresahan masyarakat karena harga tanah turun dan protes masyarakat terhadap pembangunan SUTET
==================================================================================================
For deliver electricity from power plant to residential, industrial zones and others, it must going through the Extra High Voltage Transmission Lines (SUTET). Construction of Extra High Voltage Transmission Lines (SUTET) potentially causing some impacts and risks to environment around the project. It needs a risk management for controling and monitoring risks that arise during the pre construction and construction phase. This thesis purpose is to identified environmental risks and analyze environmental risks that occur. The initial phase of this study is to identified the risks using literature study, observation, and interviews. The next step is doing risk analysis to determine the level of risk from an event based on probability results and impact using a risk matrix. The research obtained 4 ( four ) dominant risk variable such as changes in function of agricultural or plantations land, change of jobs , social unrest cause due to land prices dropped and public protests against built Extra High Voltage Transmission Lines

Item Type: Thesis (Undergraduate)
Additional Information: RSS 658.155 San a
Uncontrolled Keywords: Identifikasi Risiko, Analisis Risiko, SUTET
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 15 Apr 2020 05:06
Last Modified: 15 Apr 2020 05:06
URI: http://repository.its.ac.id/id/eprint/75793