An Nizar, Afrizal Rif (2016) “Rainwater Harvesting” Sebagai SolusiMengatasi Krisis Kekeringan Di Desa Wonotirto, Blitar. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3112100091-Undergraduate_Thesis.pdf - Accepted Version Download (2MB) | Preview |
Abstract
Desa Wonotirto Kecamatan Wonotirto Kabupaten
Blitar merupakan salah satu daerah yang masih sering dilanda
krisis kekeringan, akibatnya air untuk kebutuhan sehari-hari
masih kurang. Sementara itu air tanahnya cukup dalam
sehingga sulit untuk didapatkan. Kondisi air permukaan dan
topografi dari daerah ini pada umumnya tidak
memungkinkan untuk dibangun konstruksi bangunanbangunan air seperti saluran irigasi, waduk atau pipa penyalur
air. Kondisi geologi daerahnya didominasi oleh satuan batuan
gamping yang terdiri dari batuan kapur yang tidak menyerap
air. Sehingga secara praktis kebutuhan air yang didapatkan
adalah dari air hujan saja. Sebagai salah satu alternatif
pemecahan masalah dalam penyediaan air, berdasarkan
bentuk topografi dan geologi daerah ini adalah dengan
membangun bangunan air untuk sarana tandon air yang
berfungsi sebagai bak air yang bisa dipergunakan selama
musim kemarau tiba. Air hujan dari atap rumah akan
dialirkan ke pipa-pipa penyalur yang kemudian akanviii
diteruskan dan ditampung pada bak air. Sedangkan jika air
yang ditampung berlebih, maka akan disalurkan ke sungai.
Perhitungan dilakukan dengan menghitung debit dari
air hujan seluas atap rumah yang sudah dikurangi evaporasi
kemudian akan didapatkan volume bak air untuk
mendapatkan dimensi. Setelah mendapatkan dimensi dari bak
air akan diperhitungkan biaya yang diperlukan. Biaya yang
dihitung adalah penggalian dan pengurugan tanah, material
beton, pipa penyalur, dan upah pekerja.
Sehingga dapat dibuat sebuah tampungan air dengan
material beton yang akan digunakan untuk kebutuhan air
masyarakat Desa Wonotirto. Air yang tertampung akan
digunakan sebagai air baku. Untuk digunakan sebagai air
masak maupun minum maka diperlukan penelitian lebih
lanjut
========================================================================================================
Wonotirto village, Wonotirto District of Blitar is one
area that crushed by drought crisis, as a result of water for
daily needs are lacking. Meanwhile the groundwater is deep
enough that it is difficult to obtain. Water surface conditions
and topography of this area generally do not allow for
construction of the buildings water constructed such as
irrigation channels, reservoirs or water pipeline. Geological
conditions of the area dominated by limestone rock units
consisting of limestone that does not absorb water. So, it is
practically needs of water that obtained from rain water. As
one alternative solutions to solve problems in the provision
of water, based on the topography and geology of this area is
to build waterworks facilities for water tank that serves as a
tub that can be used during the dry season. Rainwater from
the roof of the house will be channeled into pipes dealer, then
be forwarded and stored in a bathub. Meanwhile, if the stored
water excess, it will be channeled into the river.
The calculation is performed by calculating the
discharge of rainwater covering roofs that have been reducedx
evaporation and then we will get water tank volume to get the
dimensions. After getting the dimensions of the tub, it will be
taken into account the costs involved. The calculated of costs
are excavation and hoard soil, concrete materials, pipelines,
and workers payment.
So, it can be made a water saving with concrete
material that will be used for the Wonotirto villagers. Water
being stored to be used as raw water. To be used as cooking
and drinking water will require further research
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSS 690.85 Niz r-1 |
Uncontrolled Keywords: | kebutuhan air, air hujan, bak air |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD418 Water harvesting |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis |
Depositing User: | Mr. Tondo Indra Nyata |
Date Deposited: | 16 Apr 2020 06:33 |
Last Modified: | 16 Apr 2020 06:33 |
URI: | http://repository.its.ac.id/id/eprint/75808 |
Actions (login required)
View Item |