Penentuan Alternatif Pasokan Listrik Untuk Memenuhi Permintaan Integrated Steel Plant Di PT. X

Tirayoh, Nixi (2016) Penentuan Alternatif Pasokan Listrik Untuk Memenuhi Permintaan Integrated Steel Plant Di PT. X. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2511100164-Undergraduate_Thesis.pdf]
Preview
Text
2511100164-Undergraduate_Thesis.pdf - Accepted Version

Download (1MB) | Preview

Abstract

Guna menghadapi tantangan nasional akan kebutuhan baja, PT.X sebagai
perusahaan baja terintegrasi berusaha melakukan efisiensi dalam peningkatan
produksinya. Menjawab tantangan tersebut, PT.X mempertimbangkan investasi
coal boiler (boiler batubara) untuk menggantikan pembangkit tenaga uap berbahan
bakar gas saat ini menjadi pembangkit listrik tenaga uap berbahan bakar batubara.
Terdapat tiga skenario pasokan listrik yang dipertimbangkan dalam rencana
investasi coal boiler pada kawasan industri PT.X. penilaian investasi coal boiler di
PT.X ini didasarkan pada tiga model keuangan yang dikembangkan pada penelitian
ini yakni, pertama model keuangan investasi coal boiler dengan sumber pasokan
internal dimana investasi yang dilakukan menggunakan sumber pendanaan
konventional yaitu menggunakan dana sendiri dan pinjaman. Kedua melakukan
pembelian listrik dari PLN tanpa melakukan investasi (menjalankan kondisi
eksisting). Ketiga menggunakan pasokan dari pihak ke tiga yang akan membangun
dan mendanai investasi coal boiler yang direncanakan dengan skema pembelian
take-or-pay. Hasil penelitian menunjukan bahwa investasi coal boiler yang
dilakukan sendiri dengan sumber pendanaan konventionl menghasilkan nilai
tambah yang terbesar yaitu sebesar Rp2.457.623.700.640 untuk skenario A,
Rp1.797118.788.129 untuk skenario B, dan Rp3.938.965.571.193. Untuk alternatif
pembelian dari pihak ke tiga nilai yang didapat Rp1.094.286.216.698 untuk
skenario A, Rp457.487.652.569 untuk skenario B, dan (Rp5.571.436.584.259)
untuk skenario C. Sedangkan jika PT.X tidak melakukan investasi dan
menggunakan pasokan listrik dari PLN maka nilai didapat Rp(1.820.280.132.043)
untuk skenario A, Rp(2.660.245.041.508) untuk skenario B, dan
Rp722.651.696.951 untuk skenario C
==================================================================================================
In order to face national challenges in steel sectorl, PT.X as an integrated
steel company attempt to increase efficiency in production. Responding to the
challenge, PT.X consider to investing coal boiler (coal boilers) to replace the curent
steam power plants fueled gas to steam power plant coal-fired. There are three
scenarios considered in the electricity supply investment plans coal boiler in an
industrial area PT.X. valuation of investment in PT.X coal boiler is based on three
financial model developed in this study, first investment financial model coal boiler
with internal supply sources where investment is carried out using conventional
funding sources is using its own funds and loans. Second purchases of electricity
without investing (run existing condition). The third use of third-party supplies that
will build and finance investments planned coal boiler with a purchase scheme takeor-
pay. The results showed that investments made coal boiler itself, with
conventional funding generate the better added value that is equal
Rp2.457.623.700.640 for scenario A, Rp1.797118.788.129 to scenario B, and
Rp3.938.965.571.193. For an alternative to the purchase of the three values
obtained Rp1.094.286.216.698 for scenario A, Rp457.487.652.569 to scenario B,
and Rp(5.571.436.584.259) for scenario C. Whereas if PT.X not investing and using
supply of electricity, the value obtained Rp(1.820.280.132.043) for scenario A,
Rp(2.660.245.041.508) to scenario B and scenario C Rp722.651.696.951

Item Type: Thesis (Undergraduate)
Additional Information: RSI 621.319 Tir p
Uncontrolled Keywords: Pembangkit listrik, Investasi coal boiler, Take or pay, NPV
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3030 Electric power distribution systems
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: ansi aflacha
Date Deposited: 26 May 2020 04:25
Last Modified: 26 May 2020 04:27
URI: http://repository.its.ac.id/id/eprint/76031

Actions (login required)

View Item View Item