Analisa Hidden Capacity Dengan Permodelan Gate Cycle Pada Pembangkit Listrik Tenaga Uap Studi Kasus Pada PLTU Air Anyir Bangka Unit 2 Kapasitas 30 Mw PT PLN (Persero)

Muharom, Doni (2016) Analisa Hidden Capacity Dengan Permodelan Gate Cycle Pada Pembangkit Listrik Tenaga Uap Studi Kasus Pada PLTU Air Anyir Bangka Unit 2 Kapasitas 30 Mw PT PLN (Persero). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2112100072-Undergraduate_Thesis.pdf]
Preview
Text
2112100072-Undergraduate_Thesis.pdf - Accepted Version

Download (2MB) | Preview

Abstract

Kebutuhan energi listrik di Indonesia mengalami peningkatan setiap tahunnya, hal ini seiring dengan laju pertumbuhan ekonomi dan pertumbuhan penduduk yang cukup tinggi. Namun tingginya kebutuhan energi listrik belum mampu dipenuhi mengingat keterbatasan daya listrik yang ada. Hal ini ditandai dengan pemadaman listrik bergilir yang masih terus terjadi. Salah satu usaha yang dilakukan pemerintah untuk menambah pasokan energi listrik dengan membangun pembangkit listrik baru dan mengoptimalkan pembangkit listrik yang telah ada dengan melakukan konservasi energi. Tuntutan pembangkit listrik tenaga uap harus mempunyai efisiensi daya yang besar mengakibatkan faktor efisiensi merupakan hal yang sangat penting dan selalu menjadi pembahasan utama. Namun, pada PLTU 3 Air Anyir Bangka mengalami penurunan daya yang cukup besar , hal tersebut dikarenakan ketika keadaan komisioning menggunakan batu bara dengan kalor yang sangat tinggi (High Rank), tetapi pada saat ini pembangkit tersebut menggunakan batu bara dengan nilai kalor yang rendah (Low Rank)
=======================================================================================================
Electricity demand in Indonesia has increased every year, this is following with economic growth and population growth are quite high. However, the high electrical energy demand not able to fulfill given the limitations of the existing electric power. It is characterized by rolling blackouts are still happening. One of the solutions made by the government to increase the supply of electric energy by building new power plants and optimizing existing power plants to conserve energy. Demands steam power plant must have great power efficiency resulting in an efficiency factor is very important and has always been a major discussion. However, the power plant 3 Air Anyir Bangka decreased considerable power, it is because when the state of the commissioning of using coal with a calorific very high (High Rank), but at this time the plant using coal with a calorific value of low (Low Rank)

Item Type: Thesis (Undergraduate)
Additional Information: RSM 621.402 2 Muh a
Uncontrolled Keywords: Batu bara; hidden capacity; efisiensi; bahan bakar
Subjects: Q Science > QC Physics > QC320 Heat transfer
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Yeni Anita Gonti
Date Deposited: 29 May 2020 03:26
Last Modified: 29 May 2020 03:26
URI: http://repository.its.ac.id/id/eprint/76043