Fathoni, Rijal (2016) Simulasi Cycle-Tempo Variasi Pembagian Beban Gas Turbine Dan Steam Turbine Terhadap Performa PLTGU PJB UP Gresik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
2112100075-Undergraduate_Thesis.pdf - Accepted Version Download (2MB) | Preview |
Abstract
Energi listrik merupakan salah satu kebutuhan masyarakat yang setiap hari digunakan. Untuk menyediakan kebutuhan listrik yang meningkat, PLN selaku perusahaan penyedia listrik di Indonesia berusaha meningkatkan efisiensi dan kapasitas produksi listrik. Salah satu cara untuk meningkatkan efisiensi termal atau menurunkan nilai heat rate pembangkit adalah dengan mengombinasikan siklus Brayton dengan siklus Rankine, atau yang biasa disebut dengan Combined Cycle. Combined Cycle adalah siklus yang digunakan pada Pembangkit Listrik Tenaga Gas-Uap (PLTGU). Nilai heat rate PLTGU dipengaruhi oleh daya yang dihasilkan gas turbine dan steam turbine. Pada operasi harian, pembagian beban pada gas turbine dan steam turbine cenderung tidak tetap. Dengan pola pembagian beban yang tidak tetap, nilai heat rate pembangkit juga berubah. Oleh karena itu perlu dilakukan penelitian lebih lanjut tentang pengaruh modifikasi beban gas turbine dan steam turbine terhadap heat rate PLTGU. Penelitian tentang pengaruh modifikasi beban turbin dilakukan dengan cara simulasi pada software Cycle-Tempo. Objek yang disimulasikan adalah PLTGU PT PJB UP Gresik berkapasitas 500 MW.
=======================================================================================================
A Combined Cycle is a gas-steam power plant cycle that combines Brayton Cycle with Rankine Cycle. The main purpose of a Combined Cycle is to increase the plant thermal efficiency or to decrease the plant heat rate. The Combined Cycle heat rate is dictated by the total heat supplied to the combustion chamber and the power generated at gas and steam turbines. The load of the plant is distributed to both turbines in such way to obtain higher thermal efficiency. It is therefore the scheme of load distribution on a combined cycle power plant must be studied and analyzed thoroughly. The object of this study is a 500 MW Combined Cycle power plant of 3 gas turbines, 3 HRSG and 1 steam turbine
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSM 621.402 3 Fat s |
Uncontrolled Keywords: | PLTGU, heat rate, modifikasi pembebanan, Cycle-Tempo. |
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ785 Internal combustion engines. Spark ignition |
Divisions: | Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis |
Depositing User: | Yeni Anita Gonti |
Date Deposited: | 16 Jun 2020 08:00 |
Last Modified: | 16 Jun 2020 08:00 |
URI: | http://repository.its.ac.id/id/eprint/76167 |
Actions (login required)
View Item |