Perancangan Termal Dan Simulasi Pltgu PT. Teluk Lamong Kapasitas 800 MW Dengan Konfigurasi 2-2-1 (2x400 MW) Dan 1 -1- 1 (2x400 MW) Menggunakan Software Gate Cycle

Sutopo, Heri Tri Gunawan (2016) Perancangan Termal Dan Simulasi Pltgu PT. Teluk Lamong Kapasitas 800 MW Dengan Konfigurasi 2-2-1 (2x400 MW) Dan 1 -1- 1 (2x400 MW) Menggunakan Software Gate Cycle. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2112100029-Undergraduate_Thesis.pdf]
Preview
Text
2112100029-Undergraduate_Thesis.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Pembangunan instalasi pembangkit tenaga listrik merupakan bagian yang tidak terpisahkan dari pembangunan secara keseluruhan, karena kebutuhan akan energi tenaga listrik sejalan dengan peningkatan pertumbuhan penduduk dan ekonomi Indonesia. Dalam upaya memenuhi kebutuhan listrik, pemerintah Indonesia telah mengeluarkan kebijakan untuk melibatkan sektor swasta atau koperasi dalam kerjasama membangun pembangkit tenaga listrik sebesar 35GW untuk periode tahun 2015 – 2019. Oleh karena itu, Terminal Teluk Lamong milik PT Pelindo (Pelabuhan Indonesia) III selaku pihak swasta bekerja sama dengan PT. Pertamina untuk memenuhi kebutuhan listrik negara. Terminal Teluk Lamong akan membangun PLTGU berkapasitas 800MW. Hal ini sesuai dengan ketetapan PT. PLN dalam RUPTL (Rencana Usaha Penyediaan Tenaga Listrik) Jawa-3 800 MW 2018. PLTGU atau combined cycle power plant dipilih karena memiliki efisiensi termal yang tinggi dibandingkan PLTG atau PLTU saja
=======================================================================================================
The construction of power plant is part of the overall development , because the demands for electricity is in line with the increase of population and economic growth in Indonesia. In an effort to reach these demands, the Indonesian government has issued a policy to involve private or cooperative sector to cooperate in building power plants with a total capacity of 35GW for the period 2015 - 2019. Therefore, PT Pelindo ( Pelabuhan Indonesia ) III as private parties is cooperating with PT . Pertamina to reach the energy demands of the country. PT. Pelindo 3 will build a power plant with a capacity of 800mW . This is in accordance with the provisions of PT . PLN in RUPTL ( Electricity Supply Business Plan ) Java – 3 800 MW IN 2018 . Combined cycle gas turbine is chosen because of its high thermal efficiency compared to gas power plant or steam power plant

Item Type: Thesis (Undergraduate)
Additional Information: RSM 621.402 5 Sut p
Uncontrolled Keywords: PLTGU; heat rate; efisiensi; gate cycle; HRSG
Subjects: Q Science > QC Physics > QC320 Heat transfer
T Technology > TJ Mechanical engineering and machinery > TJ263 Heat exchangers
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Yeni Anita Gonti
Date Deposited: 22 Jun 2020 04:30
Last Modified: 22 Jun 2020 04:30
URI: http://repository.its.ac.id/id/eprint/76195

Actions (login required)

View Item View Item