Power Plant dari Gas Alam

Apriadi, Muhammad Farkhan and Khusnah, Intan Nikmatul (2020) Power Plant dari Gas Alam. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02211640000024_02211640000090-Undergraduate_Thesis.pdf]
Preview
Text
02211640000024_02211640000090-Undergraduate_Thesis.pdf

Download (14MB) | Preview

Abstract

Indonesia memiliki kekayaan sumber daya alam yang melimbah, salah satunya gas alam. Cadangan gas alam yang banyak tersebut hendaknya dimanfaatkan di Indonesia sebagai bahan pemenuh kebutuhan Indonesia itu sendiri. Hal inilah yang mendasari rencana untuk memnfaatan gas alam khususnya dibagian Barat Laut Pulau Jawa sebagai bahan bakar untuk pembangkit listrik di daerah Tangerang, Banten. Untuk menunjang pengembangan dan pemanfaatan gas alam sebagai bahan bakar untuk pembangkit dengan optimal, perlu dilakukannya studi kelayakan dan rancangan pabrik secara menyeluruh. Studi ini akan berfokus pada pengembangan pembangkit listrik berkapasitas 435,361 MW dengan umpan gas alam sebanyak 125 MMSCFD. Studi ini akan mencakup proyeksi proses pengolahan gas alam, pemanfaatannya sebagai bahan bakar untuk gas turbin, dan efisiensi gas buang menjadi pemanas untuk produksi steam, serta aspek ekonomis pabrik yang akan didirikan. Secara teknis pabrik ini terdiri dari 3 unit yaitu unit gas pretreatment menggunakan membrane gas separation, gas turbine, serta heat recovery and steam turbine. Dengan proses yang telah terpilih, biaya investasi yang harus dikeluarkan yaitu sebesar Rp 7,922 M dengan struktur permodalan investasi 20% dari modal sendiri dan 80% dari modal pinjaman, didapatkan IRR 17,2%, POT 10,27 tahun, serta harga selling electricity sebesar Rp1272/kWh.
===============================================================================================================================
Indonesia has lots of natural resources, one of that is natural gas. The natural gas reserve should be utilized in Indonesia as a material to fulfil Indonesia's needs. This thing becomes the reason for using natural gas, especially in the northwestern part of java island as a fuel of power plant in Tangerang, Banten. To support the development and utilization of natural gas as a fuel for power generation, a comprehensive study and plant design need to be carried out. This study will focus on developing a 435,361 MW power plant with 125 MMSCFD of natural gas feed. This study will cover the projection of natural gas processing, its use as fuel for gas turbine, and the efficiency of exhaust gas as a heater for steam production, as well as the economics aspect of the plant. Technically this plant consist of 3 unit process, namely the gas pretreatment unit using membrane gas separation, gas turbine, and heat recovery steam and steam turbine. With the selected process, the investment cost needed to set up this plant is IDR 7,922 billion with an investment structure of 20% own capital and 80% loan capital, an IRR of 17,2%, POT of 10,27 years, and a selling electricity price of IDR 1272/kWh.

Item Type: Thesis (Other)
Additional Information: RSK 665.7 Apr p-1 2020
Uncontrolled Keywords: gas alam, gas turbine, heat recovery, pembangkit listrik, steam turbine
Subjects: T Technology > TP Chemical technology
T Technology > TP Chemical technology > TP350 Natural gas--Drying.
Divisions: Faculty of Industrial Technology > Chemical Engineering > 24201-(S1) Undergraduate Thesis
Depositing User: Muhammad Farkhan Apriadi
Date Deposited: 22 May 2023 08:16
Last Modified: 03 Jun 2023 15:54
URI: http://repository.its.ac.id/id/eprint/76357

Actions (login required)

View Item View Item