Permata, Tristiandinda (2016) Analisis Penerapan Cut Material Order Pada Pembangunan Kapal Baru Di PT. Adiluhung Sarana Segara Indonesia Untuk Wilayah Gerbangkertasusila. Masters thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
4113203006-Master_Thesis.pdf - Accepted Version Download (4MB) | Preview |
Abstract
Galangan kapal berlokasi di tepi pantai padahal harga tanah di wilayah ini relatif mahal, sedangkan lahan galangan ini hanya diperuntukkan proses produksi. PT. Adiluhung Sarana Segara Indonesia merupakan galangan kapal kelas menengah yang sedang mendapatkan banyak order pada 2 (dua) tahun terakhir ini, namun lahannya terbatas. Salah satu solusinya adalah dengan metode outsourcing yang menjadi trend indsutri saat ini, sehingga galangan kapal dapat fokus pada inti bisnisnya, yaitu hanya membangun kapal. Melalui cut material order, proses fabrikasi dilakukan di perusahaan outsourcing, sehingga material yang tiba di galangan dalam kondisi siap assembly. Metode pemilihan perusahaan outsourcing adalah dengan Analytical Hierarchy Process (AHP) untuk pemilihan alternatif perusahaan yang sesuai untuk diterapkannya cut material order. Kriteria dan subkriteria pada struktur AHP diperoleh dari identifikasi penelitian – penelitian sebelumnya terkait perusahaan outsourcing, sehingga didapatkan kriteria produk dan perusahaan. Kriteria produk terdiri dari subkriteria harga, kualitas, bahan baku, standar, asuransi dan waktu produksi. Kriteria perusahaan terdiri dari subkriteria reputasi, akses, pengalaman, kapasitas produksi, fasilitas perusahaan dan kualifikasi SDM. Antar kriteria dan subkriteria dilakukan perbandingan berpasangan untuk mendapatkan alternatif yang sesuai, sehingga didapatkan perusahaan outsourcing yang dipilih pertama adalah PT. Gunawan Dianjaya Steel di Surabaya dengan nilai 0.519, PT. Ispatindo di Sidoarjo dengan nilai 0.260, PT. Indobaja Prima Murni di Gresik dengan nilai 0.136 dan PT. Peroni Karya Sentra di Mojokerto dengan nilai 0.085. Penerapan cut material order ini mampu mengefisiensi biaya fabrikasi sebesar 7.43%, waktu pekerjaan lebih efisien 58.44% dan lahan galangan lebih efisien 3.19% untuk pekerjaan lainnya.
========================================================================================================
Shipyard located at beach, whereas the proce of land at this area is expensive, although yard area just for building the ship. PT. Adiluhung Sarana Segara Indonesia is middle class shipyard where has many projects for building the ships at two years later, but this land is narrow. One of solutions is applied outsourcing method for purchase this materials, so this shipyard focus at this core business, building the ships. Cut material order is method for fabrication process doing at outsourcing fabricator, so materials arrived at shipyard are ready to assembly. Choose outsourcing fabricator use Analytical Hierarchy Process (AHP) for alternative outsourcing fabricator. Criteria and subcriteria at AHP structure from identification at journals late research about outsourcing, so get product and factory as criteria. Product criteria contains price, quality, raw material,insurance, standar an delivery time subcriteria. Factory criteria contains reputation, access, capacities, facilities, human qualification an experiences subcriteria. Pairwise comparison applied to criteria and subcriteria to get alternatives of fabricator outsouring, so the first rank is PT. Gunawan Dianjaya Steel at Surabaya has final score 0.519, PT. Ispatindo at Sidoarjo has final score 0.260, PT. Indobaja Prima Murni at Gresik has final score 0.136 and PT. Peroni Karya Sentra at Mojokerto has final score 0.085. Cut material order can reduce fabrication cost 7.43%, production time 58.44% and land 3.19% for another work.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTKe 623.83 Per a 3100016067723 |
Uncontrolled Keywords: | Cut material order, Outsoucing, Gerbangkertasusila |
Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
Divisions: | Faculty of Marine Technology (MARTECH) > Marine Engineering > 36101-(S2) Master Theses |
Depositing User: | Yeni Anita Gonti |
Date Deposited: | 24 Jul 2020 06:51 |
Last Modified: | 24 Jul 2020 06:51 |
URI: | http://repository.its.ac.id/id/eprint/76500 |
Actions (login required)
View Item |