Analisis Risiko Proses Decommissioning : Studi Kasus Lima-Compressor Platform

Windiargo, Arif (2020) Analisis Risiko Proses Decommissioning : Studi Kasus Lima-Compressor Platform. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311640000011-Undergraduate_Thesis.pdf]
Preview
Text
04311640000011-Undergraduate_Thesis.pdf

Download (1MB) | Preview

Abstract

Proses eksplorasi dan eksploitasi minyak bumi adalah kegiatan yang sangat penting dalam upaya pemenuhan kebutuhan energi di dunia. Proses eksplorasi dan eksploitasi minyak bumi saat ini berpusat pada wilayah perairan dangkal di wilayah continental shelf. Dalam proses eksplorasi dan eksploitasi minyak bumi di wilayah perairan dangkal, struktur yang aling umum digunakan adalah struktur jacket. Di wilayah asia tenggara terdapat sekitar 1300 platform, dimana 80% sudah berusia diatas 20 tahun. Ketika platform sudah mencapai batas operasionalnya, menurut Peraturan Menteri ESDM nomor 1 tahun 2011 platform tersebut haruslah dibongkar (decommissioning) sesuai dengan standar teknis yang ada. Dalam proses pembongkaran ini tentunya terdapat risiko dan bahaya yang dapat mengganggu jalannya proses decommissioning. Untuk itu perlu dilakukan analisa risiko untuk memetakan risiko yang dapat terjadi sekaligus mempersiapkan langkah mitigasinnya. Dalam penelitian ini akan dilakukan analisa risiko dengan menentukan aktivitas yang memiliki tingkat bahaya yang signifikan dimana disimpulkan bahwa altivtas yang memiliki tingkat risiko signifikan adlah aktifitas yang berhubungan dengan construction, lifting, maintenance, well service, dan maintenance. Dari tiap aktivitas yang memiliki tingkat bahaya signifikan inim, selanjutnya akan dilakukan proses penentuan penyebab risiko dengan menggunakan metode Fault Tree Analysis (FTA) sekaligus menentukan barrier yang berfungsi untuk mencegah suatu risiko terjadi. Selanjutnya adalah menentukan dampak yang dapat ditimbulkan dari risiko dengan dengan mengunakan metode Event Tree Analyis (ETA) sekaligus menentukan barrier yang berfungsi untuk mencegah dan mengurangi dampak yang ditimbulkan ketika terjadi suatu kodisi bahaya. Kedua diagram FTA dan ETA ini akan digabungkan untuk menyusun diagram Bowtie untuk memaparkan secara detail mengenai manajemen risiko yang dilakukan dalam setiap tahap proses decommisiioning.
===================================================
The process of petroleum exploration and exploitation is a crucial activity in the fulfillment of energy needs in the world. The process of petroleum exploration and exploitation is currently centred on shallow water regions in the continental shelf. In the process of petroleum exploration and exploitation in shallow waters, the structure of which is commonly used is the jacket structure. In Southeast Asia there are about 1300 platforms, of which 80% is over 20 years old. When the platform has reached its operational limit, according to the ministerial regulation of ESDM number 1 year 2011 The platform must be decommissioning in accordance with existing technical standards. In the process of demolition, there are certainly risks and hazards that can interfere with the process of decommissioning. It is necessary to do a risk analysis to map the risks that can occur while preparing the mitigation steps. In this study, risk analysis will be conducted by determining the activity that has a significant degree of hazard where it is concluded that activities that have a significant risk level are activities related to construction, lifting, maintenance, well service, and maintenance. From each activity that has a significant hazard level, there will be a process of determining the cause of risk using the Fault Tree Analysis (FTA) method while determining the barrier that serves to prevent a risk occurring. The next is to determine the impact that can be inflicted from risk by using the Event Tree Analyis (ETA) method while determining the barrier that serves to prevent and reduce the impact that occurs when there is a peril. These two FTA and ETA diagrams will be combined to create a Bowtie diagram to explain in detail the risk management performed at each stage of the decommisiioning process.

Item Type: Thesis (Other)
Uncontrolled Keywords: Decommissioning, Fault Tree Analysis, Event Tree Analysis, Bowtie Analysis, Risk Analysis, Analisis Risiko
Subjects: T Technology > T Technology (General) > T174.5 Technology--Risk assessment.
T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Arif Windiargo
Date Deposited: 15 Aug 2020 03:52
Last Modified: 13 Jun 2023 08:41
URI: http://repository.its.ac.id/id/eprint/78224

Actions (login required)

View Item View Item