Pra Desain Pabrik Onshore Liquified Natural Gas (OLNG) Blok Masela

Furtiansyah, Mokhammad Rifqi and Ardian, Irfan (2020) Pra Desain Pabrik Onshore Liquified Natural Gas (OLNG) Blok Masela. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02211640000030_02211640000041-Undergraduate_Thesis.pdf]
Preview
Text
02211640000030_02211640000041-Undergraduate_Thesis.pdf

Download (8MB) | Preview

Abstract

Gas alam merupakan suatu campuran yang tersusun dari gas-gas hidrokarbon yang didominasi oleh metana (CH4). Gas alam cair (Liquefied Natural Gas) adalah gas alam yang telah diproses untuk menghilangkan pengotor dan hidrokarbon berat yang kemudian gas alam diproses menjadi cair pada tekanan atmosfer dengan mendinginkannya sekitar -160°C. Proses pembuatan LNG dari gas alam terdiri dari 6 unit utama, diantaranya 1. Separation unit. 2. Acid Gas Removal unit yang berfungsi untuk mengabsorbsi kandungan H2S dan CO2. 3. Dehidration unit yang berfungsi untuk mengadsorbsi kandungan H2O. 4. Fractionation unit yang berfungsi untuk memisahkan hidrokarbon berat dalam gas alam sehingga menghasilkan LNG dengan kandungan metana tinggi. 5. Liquefication unit yang berfungsi untuk mencairkan gas alam menjadi LNG yang siap dijual. 6. Stabilization unit. Abadi gas field merupakan bagian dari Blok Masela terletak di lepas pantai Provinsi Maluku, wilayah timur Indonesia. Blok Masela merupakan blok yang memiliki cadangan gas terbukti terbesar kedua di Indonesia setelah Blok Natuna yaitu sebesar 10,73 TCF (trillion cubic feet) sehingga membuat blok ini menjadi salah satu blok yang diharapkan dapat memenuhi kebutuhan gas di Indonesia. Dengan cadangannya yang begitu besar, diperlukan onshore processing untuk mengoptimalkan penyerapan dengan keuntungan kapasitas proses yang besar. Pabrik direncanakan beroperasi secara kontinu 24 jam selama 330 hari pertahun operasi dengan kapasitas produksi 700 MMSCFD. Berdasarkan analisa ekonomi dengan menggunakan metode pendekatan discounted cash flow yang terdiri dari perhitungan biaya produksi dan aliran kas/kinerja keuangan yang telah dilakukan, diperoleh hasil IRR 31.58 % per tahun, POT 3.13 tahun, dan BEP 46,5 %. Dari parameter teknis dan ekonomis yang didapat, disimpulkan bahwa pabrik Onshore Liquified Natural Gas (OLNG) Blok Masela ini layak untuk didirikan.
=================================================================================================
Natural gas is a mixture composed of hydrocarbon gases which is dominated by methane (CH4). Liquefied Natural Gas is natural gas that has been processed to remove impurities and heavy hydrocarbons which are then processed to become liquid at atmospheric pressure by cooling it to around -160 ° C. The process of making LNG from natural gas consists of 6 main units, including 1. Separation unit. 2. Acid Gas Removal unit which functions to absorb H2S and CO2 content. 3. Dehydration unit which functions to adsorb H2O content. 4. Fractionation unit which functions to separate heavy hydrocarbons in natural gas to produce LNG with high methane content. 5. Liquefication unit which functions to liquefy natural gas into LNG which is ready for sale. 6. Stabilization unit. Abadi gas field is part of the Masela Block located off the coast of Maluku Province, eastern Indonesia. Masela Block is a block that has the second largest proven gas reserves in Indonesia after the Natuna Block, which is 10.73 TCF (trillion cubic feet), making this block one of the blocks expected to meet Indonesia's gas demand. With such large reserves, onshore processing is required to optimize it with the advantage of large processing capacity. The factory is planned to operate continuously 24 hours for 330 days per year of operation with a production capacity of 700 MMSCFD. Based on economic analysis using the discounted cash flow approach method which consists of the calculation of production costs and cash flow / financial performance that has been carried out, the IRR results are 31.58% per year, POT 3.13 years, and BEP 46.5%. From the technical and economic parameters obtained, it is concluded that the Masela Block Onshore Liquified Natural Gas (OLNG) plant is feasible to build.

Item Type: Thesis (Other)
Uncontrolled Keywords: Onshore, Gas Alam, Liquefaction, Kapasitas.
Subjects: T Technology > TP Chemical technology > TP350 Natural gas--Drying.
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Chemical Engineering > 24201-(S1) Undergraduate Thesis
Depositing User: Irfan Ardian
Date Deposited: 21 Aug 2020 00:28
Last Modified: 15 Jun 2023 07:15
URI: http://repository.its.ac.id/id/eprint/78244