Analisis Program Penjadwalan Inspeksi Amine Reboiler Heat Exchanger Menggunakan Metode Risk-Based Inspection API 581

Syawalina, Khoirunnisa Mahdiyah (2020) Analisis Program Penjadwalan Inspeksi Amine Reboiler Heat Exchanger Menggunakan Metode Risk-Based Inspection API 581. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211640000021-Undergraduate_Thesis.pdf]
Preview
Text
04211640000021-Undergraduate_Thesis.pdf

Download (7MB) | Preview

Abstract

Pada industri pengolahan minyak dan gas, untuk pemurnian dan pengolahan minyak dan gas bumi dibutuhkan proses penukaran kalor untuk memisahkan H2S dan CO2 dari gas alam dengan larutan amina. Proses tersebut terjadi di dalam amine reboiler yang merupakan shell and tube heat exchanger. Fluida proses yang mengalir pada Amine Reboiler memiliki komposisi kimia Air, CO2, H2S dan MDEA dengan pH 7.83 pada shell side (HEXSS) dan Therminol-55 pada tube side (HEXTS). Dengan komposisi kimia tersebut, ditambah dengan tekanan dan temperatur operasi yang tinggi, membuat fluida menjadi lingkungan yang korosif bagi Amine Reboiler. Sehingga diperlukan program inspeksi dan penjadwalan yang akurat untuk menjamin umur peralatan, memastikan instalasi aman dan keamanan pekerja. Oleh karena itu perlu untuk melakukan evaluasi risiko untuk peralatan shell and tube heat exchanger menggunakan metode Risk Based Inspection (RBI) yang mengacu pada API RP 581. Risiko Amine Reboiler merupakan kombinasi dari Probability of Failure (PoF) dan Consequence of Failure (CoF). Dari hasil analisis, nilai PoF pada saat RBI date yang didapatkan adalah sebesar 2.080E-03 untuk HEXSS dan 4.758E-03 untuk HEXTS. PoF pada saat RBI plan date didapatkan sebesar 4.646E-03 untuk HEXSS dan 8.454E-03 untuk HEXTS Sedangkan analisis CoF menunjukkan bahwa area yang terdampak apabila terjadi kerusakan adalah 4.56 m^2 untuk konsekuensi HEXSS dan $218,675.43 untuk HEXTS. Dari PoF dan CoF yang didapatkan, level risiko HEXSS pada matriks risiko saat RBI date adalah 9.48E-03 m^2/tahun yang dikategorikan sebagai Low Risk dan saat RBI plan date 2.12E-02 m^2/tahun yang dikategorikan sebagai Medium Risk. Sedangkan level risiko HEXTS pada matriks risiko saat RBI date adalah 1040.49 $/tahun yang dikategorikan sebagai Medium-High Risk dan saat RBI plan date adalah 1848.59 $/tahun yang dikategorikan sebagai Medium-High Risk. Kemudian waktu yang disarankan untuk melaksanakan inspeksi adalah pada tanggal 1 Januari 2020.
=============================================================================================================
In the oil and gas processing industry, for the purification and processing of oil and natural gas, the process of heat conversion is needed to separate the H2S and CO2 from natural gas with amine solution. The process takes place inside the amine reboiler which is a shell and tube heat exchanger. Process fluid flowing in the Amine Reboiler has the chemical composition of water, CO2, H2S, and MDEA with a pH of 7.83 on the shell side (HEXSS) and Therminol-55 on the tube side (HEXTS). With such chemical composition, operated with high pressure and temperature, makes the fluid into a corrosive environment for Amine Reboiler. Therefore, an accurate inspection and scheduling program is required to ensure equipment life, ensuring the safe installation and safety of workers. Therefore, it is necessary to conduct a risk evaluation for shell and tube heat exchanger equipment using the Risk-Based Inspection (RBI) method which refers to the API RP 581. The risk of Amine Reboiler is a combination of the Probability of Failure (PoF) and the Consequence of Failure (CoF). From the results of the analysis, the PoF value at the time of RBI date obtained is 2.080E-03 for HEXSS and 4.758E-03 for HEXTS. PoF at the RBI plan date is obtained at 4.646E-03 for HEXSS and 8.454E-03 for HEXTS. While the CoF analysis showed that the affected area in case of damage is 4.56 m^2 for the consequences of HEXSS and $218,675.43 for HEXTS. From the PoF and CoF obtained, the HEXSS risk level on the risk matrix at the RBI date is 9.48E-03 m^2/year is categorized as Low Risk and at RBI plan date is 2.12E-02 m^2/year which is categorized as Medium Risk. While the risk level of HEXTS on risk matrix at RBI date is 1040.49 $/year which is categorized as Medium-High Risk and at RBI plan date is 1848.59 $/year which is categorized as Medium-High Risk. Then the recommended date to carry out the inspection is January 1, 2020.

Item Type: Thesis (Other)
Uncontrolled Keywords: RBI, Amine Reboiler, PoF, CoF, Risiko RBI, Amine Reboiler, PoF, CoF, Risk
Subjects: T Technology > T Technology (General) > T174.5 Technology--Risk assessment.
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Khoirunnisa Mahdiyah Syawalina
Date Deposited: 24 Aug 2020 08:24
Last Modified: 21 Jun 2023 15:18
URI: http://repository.its.ac.id/id/eprint/79853

Actions (login required)

View Item View Item